Line 5: | Line 5: | ||
These tasks can be started now: | These tasks can be started now: | ||
- | * <del>Install | + | * Install |
- | * <del>Fit mains cable and plug to access control power supply, and PAT test.</ | + | * Deep shelf for PSU and function generator |
- | * < | + | * Shelves |
- | * < | + | * <del>Order/ |
- | * < | + | * Run 4 cat5 cables from G11 rack to G14 roof space |
- | * <del>Fit access control reader box to wall outside door.</ | + | * Sort/tidy/ |
- | * Order door-closed sensor (magnetic reed sensor). | + | * Clean ESD mats and trim to match worktops |
- | * Order/ | + | * <del>Install louvre panels on short wall below conduit [1 done, 2 to go]</ |
- | * Run 12V two-core from PSU to access control box via conduit. | + | * Steal the worktop that currently covers the 2nd sink in G1. Cut it to make a 150x55cm shelf. |
- | * Laser-cut an improved 1-gang plate for NFC reader. | + | * Obtain some chairs (3-4, computer operator chairs or " |
- | * Build access control reader. -> Tim | + | |
- | ===== Access control | + | ===== Shelves |
- | The door will be fitted with the same type of lock as used for G2 and G8. The lock is currently | + | The vertical brackets are installed but we will need to order more horizontals, |
- | ===== Floor ===== | + | On the narrow end of the room, above the component drawers: |
- | The floor has damage that will need to be filled. Then it can be painted or covered with vinyl (this is a more practical task than for G1 as the space is small and already empty). | + | * 3 of 226cm x 30-31cm |
- | ESD flooring has been proposed but is likely to be expensive. We have a roll of ESD flooring but it is soft (anti-fatigue, | + | To the left of the window: |
- | ===== Networking ===== | + | * 150cm x 54cm (for the function generator and HP power supply) |
+ | * 150cm x 25-30cm (for oscilloscope, | ||
- | Cables will be run from the server rack in G11 (2-4 would be appropriate). A UniFi access point will be installed (this is in stock). | + | On the long wall: |
- | ===== Benches and storage | + | * Many of ~290cm x 30cm (general |
+ | * ~290cm x 25-30cm (for oscilloscope, | ||
- | Proposed: 75-80cm benches against | + | To the right of the sink, attached to wall and sink unit: |
- | Discussions ongoing. | + | * Recessed shelf for PCB etch tank. |