User Tools

Site Tools


g14_setup

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Next revisionBoth sides next revision
g14_setup [2019-07-04 10:37] – [Tasks] timg14_setup [2019-08-10 17:56] – [Tasks] tim
Line 5: Line 5:
 These tasks can be started now: These tasks can be started now:
  
-  * Order/source a combined euro-profile and handle for door.+  * Install shelf for PCB etch tank 
 +  * <del>Deep shelf for PSU and function generator</del> 
 +  * Shelves (see below) 
 +  * <del>Order/source a combined euro-profile and handle for door.</del> 
 +  * Run 4 cat5 cables from G11 rack to G14 roof space 
 +  * Sort/tidy/prepare electronics components for the move 
 +  * Clean ESD mats and trim to match worktops 
 +  * <del>Install louvre panels on short wall below conduit [1 done, 2 to go]</del> 
 +  * <del>Steal the worktop that currently covers the 2nd sink in G1. Cut it to make a 150x55cm shelf.</del> 
 +  * Obtain some chairs (3-4, computer operator chairs or "guest" chairs)
  
-===== Access control =====+===== Shelves =====
  
-The door will be fitted with the same type of lock as used for G2 and G8The lock is currently on order and all other components are in stock.+The vertical brackets are installed but we will need to order more horizontals, and to source the shelf boardsGiven the amount of worktop that we will be removing from G1 later on, it might be worth installing only a limited amount of shelving for now instead of buying new material.
  
-===== Floor =====+On the narrow end of the room, above the component drawers:
  
-The floor has damage that will need to be filled. Then it can be painted or covered with vinyl (this is a more practical task than for G1 as the space is small and already empty).+  * 3 of 226cm x 30-31cm (slightly less than 226 to allow for the conduit).
  
-ESD flooring has been proposed but is likely to be expensive. We have a roll of ESD flooring but it is soft (anti-fatigue, designed for standing workstations) and will be easily torn by chairs.+To the left of the window:
  
-===== Networking =====+  * 150cm x 54cm (for the function generator and HP power supply) 
 +  * 150cm x 25-30cm (for oscilloscope, soldering tools, etc)
  
-Cables will be run from the server rack in G11 (2-4 would be appropriate). A UniFi access point will be installed (this is in stock).+On the long wall:
  
-===== Benches and storage =====+  * Many of ~290cm x 30cm (general storage
 +  * ~290cm x 25-30cm (for oscilloscope, soldering tools, etc)
  
-Proposed: 75-80cm benches against the long walls of the room. No bench on the short ends (because corners are too restrictive). Use the short end (away from the door) for storage. Shelving over the benches (some mix of general storage and ready-to-use equipment).+To the right of the sink, attached to wall and sink unit:
  
-Discussions ongoing.+  * Recessed shelf for PCB etch tank.
  

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki