g14_setup
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
g14_setup [2019-07-09 10:33] – [Benches and storage] tim | g14_setup [2019-07-14 00:25] – tim | ||
---|---|---|---|
Line 8: | Line 8: | ||
* Run 4 cat5 cables from G11 rack to G14 roof space | * Run 4 cat5 cables from G11 rack to G14 roof space | ||
* Install UniFi access point | * Install UniFi access point | ||
- | * Order new legs for sink unit | + | * <del>Order new legs for sink unit</ |
Line 43: | Line 43: | ||
[[https:// | [[https:// | ||
- | ==== Plywood | + | ==== Storage |
- | Alfie to add pricing... | + | On the short (far) wall: |
+ | |||
+ | * pick bins below the conduit | ||
+ | * component drawers above the conduit (up to 7 units can fit across the width of the wall). | ||
+ | * normal shelves above the component drawers | ||
+ | |||
+ | Above the conduit over the workbenches we will fit twinslot shelf rails: | ||
+ | |||
+ | * 15-30cm shelves above the conduit for oscilloscopes, | ||
+ | * louvre panels above for other tools and easy-access pick bins. | ||
+ | * normal shelves above the panels. | ||
+ | |||
+ | [[http:// | ||
+ | [[http:// | ||