These tasks can be started now: | These tasks can be started now: | ||
+ | * Install shelf for PCB etch tank | ||
+ | * < | ||
* Shelves (see below) | * Shelves (see below) | ||
- | * Order/ | + | * <del>Order/ |
* Run 4 cat5 cables from G11 rack to G14 roof space | * Run 4 cat5 cables from G11 rack to G14 roof space | ||
* Sort/ | * Sort/ | ||
- | * Clean ESD mats and trim to match worktops | + | * <del>Clean ESD mats and trim to match worktops</ |
- | + | * <del>Install louvre panels on short wall below conduit [1 done, 2 to go]</ | |
- | Soon: | + | * < |
- | + | * Obtain some chairs (3-4, computer operator chairs or " | |
- | * Install louvre panels on short wall below conduit [waiting for delivery] | + | |
- | * Install component drawers on short wall above conduit [waiting for delivery] | + | |
===== Shelves ===== | ===== Shelves ===== |