g14_setup
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
g14_setup [2019-08-09 18:59] – [Tasks] tim | g14_setup [2019-08-12 12:36] – [Tasks] tim | ||
---|---|---|---|
Line 6: | Line 6: | ||
* Install shelf for PCB etch tank | * Install shelf for PCB etch tank | ||
- | * Deep shelf for PSU and function generator | + | * <del>Deep shelf for PSU and function generator</ |
* Shelves (see below) | * Shelves (see below) | ||
- | * Order/ | + | * <del>Order/ |
* Run 4 cat5 cables from G11 rack to G14 roof space | * Run 4 cat5 cables from G11 rack to G14 roof space | ||
* Sort/ | * Sort/ | ||
- | * Clean ESD mats and trim to match worktops | + | * <del>Clean ESD mats and trim to match worktops</ |
* < | * < | ||
- | * Steal the worktop that currently covers the 2nd sink in G1. Cut it to make a 150x55cm shelf. | + | * <del>Steal the worktop that currently covers the 2nd sink in G1. Cut it to make a 150x55cm shelf.</ |
* Obtain some chairs (3-4, computer operator chairs or " | * Obtain some chairs (3-4, computer operator chairs or " | ||