User Tools

Site Tools


g14_setup

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revisionBoth sides next revision
g14_setup [2019-08-10 17:56] – [Tasks] timg14_setup [2019-08-12 12:36] – [Tasks] tim
Line 11: Line 11:
   * Run 4 cat5 cables from G11 rack to G14 roof space   * Run 4 cat5 cables from G11 rack to G14 roof space
   * Sort/tidy/prepare electronics components for the move   * Sort/tidy/prepare electronics components for the move
-  * Clean ESD mats and trim to match worktops+  * <del>Clean ESD mats and trim to match worktops</del>
   * <del>Install louvre panels on short wall below conduit [1 done, 2 to go]</del>   * <del>Install louvre panels on short wall below conduit [1 done, 2 to go]</del>
   * <del>Steal the worktop that currently covers the 2nd sink in G1. Cut it to make a 150x55cm shelf.</del>   * <del>Steal the worktop that currently covers the 2nd sink in G1. Cut it to make a 150x55cm shelf.</del>

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki