g14_setup
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
g14_setup [2019-08-10 17:56] – [Tasks] tim | g14_setup [2019-08-17 10:57] – [Shelves] alfie | ||
---|---|---|---|
Line 11: | Line 11: | ||
* Run 4 cat5 cables from G11 rack to G14 roof space | * Run 4 cat5 cables from G11 rack to G14 roof space | ||
* Sort/ | * Sort/ | ||
- | * Clean ESD mats and trim to match worktops | + | * <del>Clean ESD mats and trim to match worktops</ |
* < | * < | ||
* < | * < | ||
Line 26: | Line 26: | ||
To the left of the window: | To the left of the window: | ||
- | * 150cm x 54cm (for the function generator and HP power supply) | + | * < |
* 150cm x 25-30cm (for oscilloscope, | * 150cm x 25-30cm (for oscilloscope, | ||