 The flooring in G1 is rapidly deteriorating. At the 2019 AGM, it was decided that the floor needs to be fixed: Alfie was appointed to organise fixing the floor in G1, which means deciding how to fix it and wrangling members into fixing it.   The flooring in G1 is rapidly deteriorating. At the 2019 AGM, it was decided that the floor needs to be fixed: Alfie was appointed to organise fixing the floor in G1, which means deciding how to fix it and wrangling members into fixing it.  
  
-Alfie knows next to nothing about floors, so this wiki page chronicles Alfie Learning These Things And Fixing The Floor, Hopefully. +Alfie knows next to nothing about floors, so this wiki page chronicles Alfie Learning These Things And Fixing The Floor, Hopefully.
  
 +Floor area 9.1x4.2m = 38.22m².
 +
 +====== THE PLAN ======
 +
 +<code>
 +We're not replacing the whole floor, because that's a metric ton of effort. Instead, we're just painting the highest traffic section in the middle of G1. This is from the kitchen to the door, where the existing floor covering is not deteriorating. I have laid a strip of duct tape at this border. 
 +
 +We will start fairly early on the Saturday morning (I'm expecting about 10AM) to clear the floor and move the sofa/etc up to the end of the room that we're not painting. 
 +
 +We will then wirebrush the concrete to prepare it for painting. This will be done with angle grinders and wire cups, and is gonna *suck*. If you have hearing protection and a respirator you like, bring them. The lab will be buying some disposable dust masks for those who don't. 
 +
 +After that, we will apply three coats of paint:
 +
 +The first is a sealing coat,which involves diluting the paint with water in order to stabilise the top surface of the concrete. This will take about two to four hours dry "touch-dry", which is about when we can start applying the second coat. I estimate we'll be able to start this around 1-2pm, which takes us through to 4-6PM when we'll be able to apply the second coat. 
 +
 +Coats #2 and #3 are full coats of the floor paint. Each coat will need approximately six hours to dry before it can be walked on or painted over, and about will continue drying for about 72 hours (less in practice, because we have heating and an extractor fan). 
 +
 +This means the second coat will dry by about midnight, so I'd suggest we let it dry overnight and apply the last coat on Sunday morning (about 9-10 AM), before moving the furniture back in at towards late Sunday afternoon. 
 +</code>
 +
 +===== Volunteers & Shifts =====
 +
 +Shifts available:
 +
 +    * Clear G1 (10AM Sat) 
 +    * Wirebrush & Coat 1 (12PM Sat) 
 +    * Coat 2 & Pizza! (4PM Sat) 
 +    * Coat 3 (9AM Sun)
 +    * Re-populate G1 & Pizza! (4PM Sun) 
 +
 +^ Name    ^ Clear G1     ^ Wirebrush & Coat 1  ^ Coat 2  & Pizza! ^ Coat 3 ^ Repopulate G1 & Pizza! ^
 +| Alfie   | Aye          | Aye                 | Aye    | Aye    | Aye                    | 
 +| Mike    | Probably not | Yes                 | Maybe  | Maybe  | Maybe                  |
 +| Vytas   | Aye          | Aye (for wirebrush) | Nay    | Nay    | Nay                    | 
 +| Peter   | No           | No                  | No     | Yes    | Yes                    | 
 +| Cameron | No           | Maybe               | Yes    | No     | Yes                    | 
 +| Taisiya | No           | No                  | Yes    | No     | No                     |
 +| David   | No           | No                  | No     | Maybe  | Maybe                  |
 +
 +----
 ===== What's there now? ===== ===== What's there now? =====
  
Line 134: Line 174:
   * I don't know anyone who has experience laying it. We'd need to look for a quote from folks. It would also mean completely clearning G1, but that's not necessarily an issue particular to this solution.   * I don't know anyone who has experience laying it. We'd need to look for a quote from folks. It would also mean completely clearning G1, but that's not necessarily an issue particular to this solution.
   * We'd need someone to come and tell us if our current concrete is suitable.   * We'd need someone to come and tell us if our current concrete is suitable.
 +
 +=== Option 6: Lino ===
 +
 +Pull up old lino, put down new lino
 +
 +== Pros ==
 +
 +  * Easy
 +
 +== Cons ==
 +
 +  * llama
 +
  
 === Option ?: Something else === === Option ?: Something else ===