User Tools

Site Tools


g1_refurbishment

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Next revisionBoth sides next revision
g1_refurbishment [2020-01-18 22:40] costag1_refurbishment [2020-01-19 10:50] costa
Line 3: Line 3:
 The general plan of refurbishment of G1 (the main room) is to make it suitable for larger groups of people. It is also desirable to create both, working and recreational areas. The general plan of refurbishment of G1 (the main room) is to make it suitable for larger groups of people. It is also desirable to create both, working and recreational areas.
  
 +{{:2020-01-18_22-48-52.png?800|}}
  
-{{:2019-11-27_19-02-10.png?400|}}+==== Decision making section ==== 
 + 
 + 
 +https://doodle.com/poll/u3f3h244xw9kftxv Floor Type Choosing Doodle 
 +    
  
  
  
 +==== Planning and timing section ====
  
 It involves the following stages with a very optimistic estimate of time: It involves the following stages with a very optimistic estimate of time:
Line 86: Line 92:
 {{:commercial-carpet-tiles-stebro-flooring-office-flooring.jpg?400|}} {{:commercial-carpet-tiles-stebro-flooring-office-flooring.jpg?400|}}
  
 +
 +
 +
 +
 +=== Furniture ===
 +
 +Ikea Kallax Shelving unit - 182x182cm £150 
 +
 +https://www.ikea.com/gb/en/p/kallax-shelving-unit-white-stained-oak-effect-90324509/
 +
 +{{:kallax.jpg?400|}}
g1_refurbishment.txt · Last modified: 2020-10-25 16:45 by al

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki