laserchimney
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
laserchimney [2019-05-21 15:27] – tim | laserchimney [2019-07-06 17:50] – [Monday 6th July] tim | ||
---|---|---|---|
Line 5: | Line 5: | ||
We are in the process of installing a duct to take the fumes to roof level. | We are in the process of installing a duct to take the fumes to roof level. | ||
- | ===== Roadmap | + | ===== Monday 6th July ===== |
- | * Install the bracket that will support the blower. The bracket | + | Duct will be installed |
- | * Install the blower on the bracket. | + | Todo: |
+ | * < | ||
+ | </ | ||
+ | * Drill-out duct brackets to accept M8 bolts | ||
+ | * < | ||
+ | |||
+ | Screwfix order (in progress): | ||
+ | |||
+ | ^ Item ^ Quantity ^ | ||
+ | | [[https:// | ||
+ | | [[https:// | ||
+ | | [[https:// | ||
+ | | [[https:// | ||
+ | | 10mm x 150mm SDS drill | 3 | | ||
+ | | 12mm x 150mm SDS drill (replacement owed to Al) | 1 | | ||
+ | | Jubilee clips for fan/ | ||
+ | |||
+ | ===== Roadmap ===== | ||
+ | |||
+ | * < | ||
+ | * Install the blower on the bracket. | ||
* Order flexible duct and internal fittings to bring the extraction into G2. | * Order flexible duct and internal fittings to bring the extraction into G2. | ||
Line 17: | Line 37: | ||
* Order the vertical ducts and accessories to reach roof level (these will be too large to store so should be bought when we are ready to use them). | * Order the vertical ducts and accessories to reach roof level (these will be too large to store so should be bought when we are ready to use them). | ||
* Then arrange with Marcus to install them with the cherry picker. | * Then arrange with Marcus to install them with the cherry picker. | ||
- | |||
* Install wiring to power the blower. | * Install wiring to power the blower. | ||