laserchimney [2019-05-21 15:30] timlaserchimney [2019-07-06 15:08] – [Monday 6th July] tim
Line 4: Line 4:
  
 We are in the process of installing a duct to take the fumes to roof level. We are in the process of installing a duct to take the fumes to roof level.
 +
 +===== Monday 6th July =====
 +
 +Duct will be installed on Monday by Edinburgh Rope Access.
 +
 +Todo:
 +
 +  * <del>Fit anti-vibration mounts to fan bracket and adjust to correct positions.
 +</del>
 +  * Drill-out duct brackets to accept M8 bolts
 +  * Install new mains flex on fan
 +
 +Screwfix order (in progress):
 +
 +  * Spare square screwdriver bits for self-drilling duct screws
 +  * M8 wall anchors long and short (to be selected)
 +  * Drill bits for anchors
 +  * Replacement 12mm drill bit for Al (broken on previous install)
 +  * Sealant for duct joins (if there are any that don't use the pre-sealed couplers)
 +  * Spare jubilee clips for fan/flex/duct interface
  
 ===== Status ===== ===== Status =====
Line 11: Line 31:
 ===== Roadmap ===== ===== Roadmap =====
  
-  * Install the bracket that will support the blower. The bracket will be mounted on the outside wall, above the window between G1 and G2. This will probably require the borrowing of a larger ladder.+  * <del>Install the bracket that will support the blower. The bracket will be mounted on the outside wall, above the window between G1 and G2. This will probably require the borrowing of a larger ladder.</del>
   * Install the blower on the bracket.   * Install the blower on the bracket.
   * Order flexible duct and internal fittings to bring the extraction into G2.   * Order flexible duct and internal fittings to bring the extraction into G2.

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki