laserchimney
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
laserchimney [2019-07-06 15:08] – [Monday 6th July] tim | laserchimney [2019-07-06 17:59] – [Monday 6th July] tim | ||
---|---|---|---|
Line 14: | Line 14: | ||
</ | </ | ||
* Drill-out duct brackets to accept M8 bolts | * Drill-out duct brackets to accept M8 bolts | ||
- | * Install new mains flex on fan | + | * <del>Install new mains flex on fan</ |
Screwfix order (in progress): | Screwfix order (in progress): | ||
- | * Spare square screwdriver bits for self-drilling duct screws | + | ^ Item ^ Quantity ^ |
- | | + | | [[https:// |
- | * Drill bits for anchors | + | | [[https:// |
- | * Replacement | + | | [[https:// |
- | * Sealant for duct joins (if there are any that don't use the pre-sealed couplers) | + | | [[https:// |
- | * Spare jubilee | + | | 10mm x ~200mm SDS drill | 3 | |
- | + | | 12mm x ~200mm SDS drill (replacement owed to Al) | 1 | | |
- | ===== Status ===== | + | | Jubilee |
- | + | ||
- | Next task: Install the blower mounting bracket. We have the bracket and wall anchors. We need to arrange access to a larger ladder, borrow Al's SDS drill and do it. | + | |
===== Roadmap ===== | ===== Roadmap ===== |