lasercutter2
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
lasercutter2 [2019-05-28 19:44] – Simon | lasercutter2 [2019-06-20 04:09] – [Laser Cutter #2] random | ||
---|---|---|---|
Line 4: | Line 4: | ||
(Note: Access control is ad-hoc, Ask someone to add you after you have received a walkthrough.) | (Note: Access control is ad-hoc, Ask someone to add you after you have received a walkthrough.) | ||
- | HOURS OF USE ARE LIMITED TO **8PM-8AM** UNTIL ADDITIONAL FUME EXTRACTION HAS BEEN INSTALLED. | + | HOURS OF USE ARE LIMITED TO *NONE* UNTIL ADDITIONAL FUME EXTRACTION HAS BEEN INSTALLED. |
Model JD90125\\ | Model JD90125\\ | ||
Line 33: | Line 33: | ||
| Acrylic 4mm | 15 | 100 | Miron | | | Acrylic 4mm | 15 | 100 | Miron | | ||
| Acrylic 5mm | 12 | 100 | Miron | | | Acrylic 5mm | 12 | 100 | Miron | | ||
- | | Acrylic 8mm | | | | | + | | Acrylic 8mm | 4 | 100 | David | |
| Acrylic 10mm | 3 | 100 | Miron | | | Acrylic 10mm | 3 | 100 | Miron | | ||
- | | Ply 3mm | < | + | | Ply 3mm | < |
| Ply 4mm | 20 | 100 | Miron | | | Ply 4mm | 20 | 100 | Miron | | ||
| Ply 6mm | 9 | 100 | Miron | | | Ply 6mm | 9 | 100 | Miron | | ||
Line 93: | Line 93: | ||
* < | * < | ||
</ | </ | ||
- | * Install ducts to roof and upgrade blower, to avoid releasing fumes onto courtyard users. **ACTION: | + | * Install ducts to roof and upgrade blower, to avoid releasing fumes onto courtyard users. **ACTION: |
* < | * < | ||
* Replace broken acrylic cover on front-loading slot. | * Replace broken acrylic cover on front-loading slot. |
lasercutter2.txt · Last modified: 2023-12-24 13:36 by simon