User Tools

Site Tools


members_nights

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Next revisionBoth sides next revision
members_nights [2019-01-21 01:16] timmembers_nights [2019-02-02 19:01] tim
Line 17: Line 17:
 Alternating between Thu 19:00 and Sat 15:00, three hours in length. Start slow with a session every two weeks, increase to weekly if we can sustain it. Alternating between Thu 19:00 and Sat 15:00, three hours in length. Start slow with a session every two weeks, increase to weekly if we can sustain it.
  
-Dates under consideration and subject to confirmation... +<del>Saturday 2nd February, 3pm</del> |
- +
-| Saturday 2nd February, 3pm |+
 | Thursday 14th February, 7pm | | Thursday 14th February, 7pm |
-| Saturday 2th March, 3pm |+| Saturday 2nd March, 3pm |
 | Thursday 14th March, 7pm | | Thursday 14th March, 7pm |
 | Saturday 30th March, 3pm | | Saturday 30th March, 3pm |
Line 29: Line 27:
 ===== Activity Ideas ===== ===== Activity Ideas =====
  
-  * Cleaning and tidying (always a worthwhile contribution) +  * Main Room 
-    * Empty laser materials bin +    * Tidy all the surfaces 
-    * Sort laser material scrap +    * Remove out of date food from the fridge 
-    * Sweep/vacuum corridor+    * Re-stock the shop 
 + 
 +  * Workshop 
 +    * <del>Install organiser for the wood pile next to the door,</del> and sort the pile of wood 
 +    * Tidy all the surfaces 
 +    * Empty the vacuum cleaners and dust extractor 
 +    * Sort the junk pile underneath the CNC router 
 +    * Organise the boxes of power tools 
 + 
 +  * Laser Room 
 +    * Sort scrap materials 
 +    * Empty bins 
 + 
 +  * Store Room
     * Sort PC & computer stock     * Sort PC & computer stock
-    * Sort other materials in store room +    * Sort AV equipment 
-    Tidy and clean workshop+ 
 +  Train lab users on the restricted tools
   * Install shelves behind 3D printers   * Install shelves behind 3D printers
   * Install shelves in radio corner   * Install shelves in radio corner
-  * SatNOGS antenna rotator 
-  * Build a stand for the traffic lights that will allow them to be installed outside 
-  * Install a new antenna mounting frame on the roof 
   * Assemble additional tool access controllers   * Assemble additional tool access controllers
-  * Install lockers for secure tool storage (starting with the building of pigeonhole shelving)+  * Install CNC router
   * Collaborate on policy documentation   * Collaborate on policy documentation
-  * Train lab users on the restricted tools 
   * Work together on new training documents   * Work together on new training documents
 +  * SatNOGS antenna rotator
 +  * Build a stand for the traffic lights that will allow them to be installed outside
 +  * Install a new antenna mounting frame on the roof
 +  * Install lockers for secure tool storage
 +
 +Look for more ideas at https://roundup.ehlab.uk/
 +
members_nights.txt · Last modified: 2020-02-29 11:15 by alfie

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki