User Tools

Site Tools


members_nights

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
Next revisionBoth sides next revision
members_nights [2018-09-07 15:34] – created timmembers_nights [2019-03-17 14:53] tim
Line 5: Line 5:
   * sessions will be on a regular published schedule so that everyone knows when they happen   * sessions will be on a regular published schedule so that everyone knows when they happen
   * visitors allowed by invitation, to get involved and to get to know us   * visitors allowed by invitation, to get involved and to get to know us
 +  * personal guests allowed if they help out
   * no personal projects, everyone is expected to be working to improve the lab   * no personal projects, everyone is expected to be working to improve the lab
  
 Optionally, at the start of the session we may have a meeting to make decisions that couldn't be reached on the mailing list: Optionally, at the start of the session we may have a meeting to make decisions that couldn't be reached on the mailing list:
  
-  * topics should be published in advance and discussed on the mailing list first +  * topics must be published in advance and discussed on the mailing list first 
-  * members who can'make the meeting may ask for their opinions to be passed along by proxy+  * members who can'attend the meeting may ask for their opinions to be passed along by proxy
  
 ===== Dates ===== ===== Dates =====
  
-Alternating between Thu 19:00 and Sat 15:00, three hours in length. Start slow with a session every two weeks, increase to weekly if we can sustain it. Exact dates to be decided.+Alternating between Thu 19:00 and Sat 15:00, three hours in length. Start slow with a session every two weeks, increase to weekly if we can sustain it. 
 + 
 +| **Saturday 30th March, 3pm** | 
 +| Thursday 11th April, 7pm | 
 +| Saturday 27th April, 3pm | 
 +| Thursday 9th May, 7pm | 
 +... |
  
 ===== Activity Ideas ===== ===== Activity Ideas =====
  
-  * Cleaning and tidying (always worthwhile contribution)+  * Main Room 
 +    * Tidy all the surfaces 
 +    * Remove out of date food from the fridge 
 +    * Re-stock the shop 
 +    * Install CAT5 cables: 
 +      * <del>4x CAT5e between G1 (above door) and G11 (rack)</del> 
 +      * 2x CAT5e from G1 (above door) to G1 Window patch points 
 +    * <del>Radio corner: remove wooden drawer unit to allow proper access to screwdrivers</del> 
 +    * Electronics: sort/organise/purge the electronics storage (shelves above work area, shelves behind door) 
 +    * Organise "Tapes and Glues" drawer. 
 +    * Organise kitchen shelves: 
 +      * reduce teas to one 9L box 
 +      * reduce coffee/hot-chocolate to one 9L box 
 +      * try and create enough space that dishes can be stacked separately from plates 
 + 
 +  * Workshop 
 +    * Tidy all the surfaces 
 +    * Empty the vacuum cleaners and dust extractor 
 +    * Sort the junk pile underneath the CNC router 
 +    * Organise the boxes of power tools (small and closed boxes instead of single pile) 
 +    * Test/fit Sonoff fan controller (for the wall extractor fan) 
 +    * <del>Finish bandsaw training material</del> 
 +    * Train users on the big bandsaw 
 +    * Training docs for table saw 
 +    * Training docs for mitre saw 
 +    * Install CNC router 
 + 
 +  * Laser Room 
 +    * Sort scrap materials 
 +    * Empty bins 
 +    * Build a tool controller for small laser cutter 
 + 
 +  * Store Room 
 +    * <del>Install shelves above 3D printers</del> 
 +    * Sort PC & computer stock 
 +    * Sort AV equipment 
 +  
 +  * Train lab users on the restricted tools 
 +  * Install shelves in radio corner 
 +  * Collaborate on policy documentation
   * SatNOGS antenna rotator   * SatNOGS antenna rotator
   * Build a stand for the traffic lights that will allow them to be installed outside   * Build a stand for the traffic lights that will allow them to be installed outside
-  * Install a new antenna mounting frame on the roof 
   * Assemble additional tool access controllers   * Assemble additional tool access controllers
-  * Install lockers for secure tool storage (starting with the building of pigeonhole shelving) +  * Install a new antenna mounting frame on the roof 
-  * Tidy cabling in G1 roof space (mounting board, new PSU)+  * Install lockers for secure tool storage
  
 +Look for more ideas at https://roundup.ehlab.uk/
  
members_nights.txt · Last modified: 2020-02-29 11:15 by alfie

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki