members_nights
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
members_nights [2019-01-23 15:29] – [Activity Ideas] tim | members_nights [2019-03-30 15:28] – tim | ||
---|---|---|---|
Line 17: | Line 17: | ||
Alternating between Thu 19:00 and Sat 15:00, three hours in length. Start slow with a session every two weeks, increase to weekly if we can sustain it. | Alternating between Thu 19:00 and Sat 15:00, three hours in length. Start slow with a session every two weeks, increase to weekly if we can sustain it. | ||
- | Dates under consideration and subject to confirmation... | + | | **Saturday 30th March, 3pm** | |
- | + | ||
- | | Saturday 2nd February, 3pm | | + | |
- | | Thursday 14th February, 7pm | | + | |
- | | Saturday 2th March, 3pm | | + | |
- | | Thursday 14th March, 7pm | | + | |
- | | Saturday 30th March, 3pm | | + | |
| Thursday 11th April, 7pm | | | Thursday 11th April, 7pm | | ||
+ | | Saturday 27th April, 3pm | | ||
+ | | Thursday 9th May, 7pm | | ||
| ... | | | ... | | ||
===== Activity Ideas ===== | ===== Activity Ideas ===== | ||
- | * Cleaning | + | * Main Room |
- | * Empty laser materials bin | + | * Tidy all the surfaces |
- | * Sort laser material | + | * Remove out of date food from the fridge |
- | * Sweep/vacuum corridor | + | * Re-stock the shop |
+ | * Install CAT5 cables: | ||
+ | * < | ||
+ | * 2x CAT5e from G1 (above door) to G1 Window patch points | ||
+ | * < | ||
+ | * Electronics: | ||
+ | * Organise "Tapes and Glues" drawer. | ||
+ | * Organise kitchen shelves: | ||
+ | * reduce teas to one 9L box | ||
+ | * reduce coffee/ | ||
+ | * try and create enough space that dishes can be stacked separately from plates | ||
+ | * Deep-clean and restore the whiteboard | ||
+ | |||
+ | * Workshop | ||
+ | * Tidy all the surfaces | ||
+ | * Empty the vacuum cleaners and dust extractor | ||
+ | * Sort the junk pile underneath the CNC router | ||
+ | * Organise the boxes of power tools (small and closed boxes instead of a single pile) | ||
+ | * Test/fit Sonoff fan controller (for the wall extractor fan) | ||
+ | * Training docs for table saw | ||
+ | * Training docs for mitre saw | ||
+ | * Install CNC router | ||
+ | |||
+ | * Laser Room | ||
+ | * Sort scrap materials | ||
+ | * Empty bins | ||
+ | * Build a tool controller for small laser cutter | ||
+ | |||
+ | * Store Room | ||
+ | * < | ||
* Sort PC & computer stock | * Sort PC & computer stock | ||
- | * Sort other materials in store room | + | * Sort AV equipment |
- | * Tidy and clean workshop | + | |
* Train lab users on the restricted tools | * Train lab users on the restricted tools | ||
- | * Install shelves behind 3D printers | ||
* Install shelves in radio corner | * Install shelves in radio corner | ||
- | * Assemble additional tool access controllers | ||
- | * Install CNC router | ||
* Collaborate on policy documentation | * Collaborate on policy documentation | ||
- | | + | * SatNOGS antenna rotator |
* Build a stand for the traffic lights that will allow them to be installed outside | * Build a stand for the traffic lights that will allow them to be installed outside | ||
+ | * Assemble additional tool access controllers | ||
* Install a new antenna mounting frame on the roof | * Install a new antenna mounting frame on the roof | ||
- | * Install lockers for secure tool storage | + | * Install lockers for secure tool storage |
+ | |||
+ | Look for more ideas at https:// | ||
members_nights.txt · Last modified: 2020-02-29 11:15 by alfie