User Tools

Site Tools


members_nights

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revisionBoth sides next revision
members_nights [2019-05-21 12:58] timmembers_nights [2019-05-21 13:07] tim
Line 31: Line 31:
  
   * Main Room   * Main Room
-    * Tidy all the surfaces +    * Regular task: Tidy all the surfaces 
-    * Remove out of date food from the fridge +    * Regular task: Remove out of date food from the fridge 
-    * Re-stock the shop+    * Regular task: Re-stock the shop 
 +    * Semi-regular task: Organise the electronics storage 
 +    * Semi-regular task: Organise "Tapes and Glues" drawer
     * Install CAT5 cables:     * Install CAT5 cables:
       * <del>4x CAT5e between G1 (above door) and G11 (rack)</del>       * <del>4x CAT5e between G1 (above door) and G11 (rack)</del>
       * 2x CAT5e from G1 (above door) to G1 Window patch points       * 2x CAT5e from G1 (above door) to G1 Window patch points
-    * <del>Radio corner: remove wooden drawer unit to allow proper access to screwdrivers</del> 
-    * Electronics: sort/organise/purge the electronics storage (shelves above work area, shelves behind door) 
-    * Organise "Tapes and Glues" drawer. 
     * Organise kitchen shelves:     * Organise kitchen shelves:
-       * <del>reduce teas to one 9L box</del> 
       * reduce coffee/hot-chocolate to one 9L box       * reduce coffee/hot-chocolate to one 9L box
-      * try and create enough space that dishes can be stacked separately from plates 
-    * <del>Deep-clean and restore the whiteboard </del> 
     * Radio Corner:     * Radio Corner:
-        <del>Install shelves</del> +      Tidy-up and reduce the footprint of the radio corner 
-        * Install decent RF earth (pipework?) +      * Install decent RF earth (pipework?)
  
   * Workshop   * Workshop
-    * Tidy all the surfaces +    * Regular task: Tidy all the surfaces 
-    * Empty the vacuum cleaners and dust extractor+    * Regular task: Empty the vacuum cleaners and dust extractor 
 +    * Regular task: Train new users on power tools
     * Sort the junk pile underneath the CNC router     * Sort the junk pile underneath the CNC router
     * Organise the boxes of power tools (small and closed boxes instead of a single pile)     * Organise the boxes of power tools (small and closed boxes instead of a single pile)
-    * Training docs for table saw +    * Safety training docs for table saw 
-    * Training docs for mitre saw +    * Safety training docs for mitre saw 
-    * <del> Install CNC router </del>+    * Safety training docs for Bantam lathe
  
   * Laser Room   * Laser Room
-    * Sort scrap materials +    * Regular task: Sort scrap materials 
-    * Empty bins +    * Regular task: Empty bins
-    * <del> Build a tool controller for small laser cutter </del>+
  
   * Store Room   * Store Room
-    * <del>Install shelves above 3D printers</del> 
     * Sort PC & computer stock     * Sort PC & computer stock
     * Sort AV equipment     * Sort AV equipment
-  +
-  * Train lab users on the restricted tools+
   * Collaborate on policy documentation   * Collaborate on policy documentation
   * SatNOGS antenna rotator   * SatNOGS antenna rotator
-  * Assemble additional tool access controllers 
   * Install a new antenna mounting frame on the roof   * Install a new antenna mounting frame on the roof
  
 Look for more ideas at https://roundup.ehlab.uk/ Look for more ideas at https://roundup.ehlab.uk/
  
members_nights.txt · Last modified: 2020-02-29 11:15 by alfie

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki