This is an old revision of the document!
Table of Contents
Network
Layer 2
Name | Model | Location |
---|---|---|
switch-g11-a | Dell PowerConnect 6024 | Top-rack |
switch-g11-b | Dell PowerConnect 5224 | Mid-rack |
switch-g11-c | Netgear GS724T | Server-shelf |
switch-g1 | Netgear GS724T | G1 ceiling |
switch-roof | HP Procurve 8-port | Block B roof/plant room |
other non-managed edge switches |
switch-g11-b -- switch-g11-a -- switch-g11-c / \ / \ / \ switch-g1 switch-roof
Future Plans
We have acquired and are currently testing an HP A5120-48G switch. This is expected to serve all of the switching for G11.
We should also be getting a 3Com/HP 5500-48G which will take over switching for G1.
Layer 3
185.34.62.0/26 and 2a04:5d00:70::/48 provided by HUBS.
Internal IPv4 10.38.32.0/20, with an external NAT address of 185.34.62.2.
Routing is currently handled by a Mikrotik RouterBOARD 450G.
Future
In future, routing will be handled by VMs on Oxygen, both running BSDRP.
At this point we will be splitting the responsibilities of the old Mikrotik 450G into two - One VM (Nickel) to handle our edge (BGP speaking + Public IP Space Gateway), and one (Iron) to handle NAT and act as a gateway for all internal space. PF will be handling NAT + Firewalling on these machines.
WiFi
Hostname | Location | SSIDs |
---|---|---|
unifi-g1 | G1 (Main room) | Hacklab, spacenet |
unifi-g2 | G2 (Laser/3D-printing room) | Hacklab, spacenet |
unifi-g6 | G6 (Hot Glue's room) | Hacklab, spacenet |
unifi-g8 | G8 (Workshop) | Hacklab, spacenet |
wr703n1 | Roof | spacenet |
See WiFi for connection details.
Record Keeping
- NetBox - for VLANs, IPs, hardware and port connections (for some switches)
- Edinburgh Hacklab Assigned Numbers Authority (EHANA) - port connections (for some switches)
Manuals
- HP A5500 EI (3Com 4800G)