User Tools

Site Tools


roof

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Next revisionBoth sides next revision
roof [2018-06-23 14:41] timroof [2018-06-28 13:43] – [Block-B Roof] tim
Line 1: Line 1:
 ====== Block-B Roof ====== ====== Block-B Roof ======
 +
 +===== Current Status =====
  
 External: External:
Line 13: Line 15:
   * HF Multiband Dipole   * HF Multiband Dipole
  
-Internal:+Internal (near external door):
  
   * "sdr" PC with two RTL-SDR receivers (one with HF converter)   * "sdr" PC with two RTL-SDR receivers (one with HF converter)
Line 22: Line 24:
   * TL-WR703N access point   * TL-WR703N access point
   * 8-port network switch   * 8-port network switch
 +
 +Internal (central shelf unit):
 +
 +  * "switch-roof-b" 24-port network switch
  
 Cable links: Cable links:
Line 29: Line 35:
   * Various Coax to external antennas   * Various Coax to external antennas
  
-Accessing the external roof:+===== Accessing the external roof =====
  
 Summerhall must be contacted before any Hacklab activity is carried out on the roof (not including the plant room). This is to avoid causing alarm to security personnel. Summerhall must be contacted before any Hacklab activity is carried out on the roof (not including the plant room). This is to avoid causing alarm to security personnel.
Line 37: Line 43:
 At other times: email the list of contacts below, and **also speak to the reception desk or contact the duty manager or security by radio**. At other times: email the list of contacts below, and **also speak to the reception desk or contact the duty manager or security by radio**.
  
-reception@summerhall.co.uk, dm@summerhall.co.uk, antonia@summerhall.co.uk, info@edinburghhacklab.com +info@summerhall.co.uk, dm@summerhall.co.uk, antonia@summerhall.co.uk, info@edinburghhacklab.com 
-[[mailto:reception@summerhall.co.uk,dm@summerhall.co.uk,antonia@summerhall.co.uk,info@edinburghhacklab.com?subject=Hacklab access to Block B roof|mailto]]+[[info@summerhall.co.uk,dm@summerhall.co.uk,antonia@summerhall.co.uk,info@edinburghhacklab.com?subject=Hacklab access to Block B roof|mailto]]
  
 This is the process agreed between Al and Antonia on 28th May 2018. This is the process agreed between Al and Antonia on 28th May 2018.
 +
 +Other Rules:
 +
 +  * Don't go on the roof in bad weather.
 +  * Don't work alone.
 +  * Stay away from the bees, especially during warm daylight hours.
  
 <del>{{ :techcube_roof_access_permit_form.docx |}}</del> <del>{{ :techcube_roof_access_permit_form.docx |}}</del>
roof.txt · Last modified: 2024-01-17 02:44 by cazagen

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki