todo
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
todo [2016-06-23 22:25] – tim | todo [2016-10-14 15:57] – [Finish moving the workshop from G2 to G8] tim | ||
---|---|---|---|
Line 1: | Line 1: | ||
====== Things To Do / How Can I Help? ====== | ====== Things To Do / How Can I Help? ====== | ||
- | ===== New Room ===== | + | ===== Mini Projects |
- | Recycling: | + | ==== Drill organisation ==== |
- | * < | + | All of our drills |
- | * Take the waste electronics (in old storeroom G8) to the recycling centre | + | |
- | * Take your [[clutter|junk]] away [**EVERYONE**] | + | |
- | G11: | + | * Make or buy an organiser: |
+ | * Multiple holes for each size of drill (because one drill of each size is not enough for a hackerspace) | ||
+ | * Sections for HSS, brad-point and masonry | ||
+ | * Audit the drills. Dispose of bad ones. Sharpen where possible. Identify what we need to purchase for replacements/ | ||
+ | * Identify a suitable drill sharpening system to keep the drills in good condition. | ||
- | * < | + | ==== Finish |
- | * < | + | |
- | * Wipe down cable conduits | + | |
- | * Arrange disposal/ | + | |
- | * < | + | |
- | * < | + | |
- | * < | + | |
- | * < | + | |
- | * <del>Finish | + | |
- | * < | + | |
- | * < | + | |
- | * < | + | |
- | * < | + | |
- | * < | + | |
- | * Acquire server rack | + | |
- | * < | + | |
- | * Fit twin-slot shelving over sink area - postpone, see what's left after we do the new workshop | + | |
- | * < | + | |
- | * < | + | |
- | * Source a pull-handle and build a capacitive touch sensor | + | |
- | * Fit PIR sensor < | + | |
- | * Final clear-out from G8 to G11 | + | |
- | G8: | + | |
- | + | * Move the tools and supplies from G2 to G8 | |
- | | + | * Organise the shelves |
- | * Agree new layout [**EVERYONE**] | + | * Move the chemicals from G1 to G8 (under the sink). Dispose of empty containers. |
- | * Build and install fitted workbench | + | * Fit a smoke alarm in G8 (early warning system |
- | * Install wall-mounted tool boards | + | |
- | * Install wall-mounted | + | |
- | * Build an air filtering system | + | |
- | * Build a dust extraction system to capture dust from the power tools | + | |
- | * Purchase and install sensitive | + | |
- | + | ||
- | Financial: | + | |
- | + | ||
- | * Recruit more members to help us pay for the room [**EVERYONE**] | + | |
- | * Notify council | + | |
===== Other Stuff ===== | ===== Other Stuff ===== | ||
Line 54: | Line 25: | ||
* Design a test pattern for checking/ | * Design a test pattern for checking/ | ||
* Update OpenStreepMap to identify all the local takeaways | * Update OpenStreepMap to identify all the local takeaways | ||
- | * Make some door wedges | + | * Sort the PC parts and peripherals |
+ | * Build a webapp to view [[http:// | ||
+ | |||
+ | ---- | ||
+ | |||
+ | ===== Completed Projects ===== | ||
+ | |||
+ | ==== Fit shelving under G8 workbenches ==== | ||
+ | |||
+ | We want to install shelving under the section of workbench to the right of the drill press. Just one shelf, to divide the space into two. | ||
+ | |||
+ | ==== Relocate extraction vent in G11 Store Room ==== | ||
+ | |||
+ | The extract vent is currently located in the left corner as you enter the room. It should be relocate to the tile above the rear of the server rack, to better capture the hot air. We have an extra length of flexible hose that should enable this. | ||
+ | |||
+ | ==== Install ventilation in G8 Workshop ==== | ||
+ | |||
+ | We have permission from Summerhall to install a fan in the external wall. There are two sections where previous vents have been bricked-up, and one of these should be opened and a fan installed. | ||
+ | |||
+ | * Plan how to remove the bricks safely and without damaging the rest of the wall. | ||
+ | * Source a suitable fan. | ||
+ | * Do the work... | ||
+ | * Clean/ | ||
+ |
todo.txt · Last modified: 2022-07-04 19:30 by MirZa