User Tools

Site Tools


todo

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Next revisionBoth sides next revision
todo [2016-06-23 22:25] timtodo [2019-08-29 10:53] – [Bigger Tasks] tim
Line 1: Line 1:
-====== Things To Do How Can Help? ======+====== To-Do (How can help?======
  
-===== New Room =====+See also [[https://roundup.ehlab.uk/|Roundup]] and the [[members_nights|Members' Nights]] list.
  
-Recycling:+===== Small Tasks =====
  
-  * <del>Take the dismantled workbenches (outside workshop G2) to the recycling centre</del> +These should be immediately actionable, describable in a single bullet point and take up to 30 minutes for one person to complete:
-  * Take the waste electronics (in old storeroom G8) to the recycling centre +
-  * Take your [[clutter|junk]] away [**EVERYONE**]+
  
-G11:+  * Tidy and clear-out the kitchen cupboard. Should only contain cleaning supplies. 
 +  * G1 hifi shelvesreplace the short brackets with long brackets (we have a surplus and the shelf would be more secure). 
 +  * Laser Cutter #1: Connect the air-flow sensor into the safety loop (in series with the lid switch, water flow sensor, etc). 
 +  * Wire-up LEDs for one remaining tool locker. 
 +  * Secure tool locker LED wiring with hot glue (at the point where the wires meet the LED strip). 
 +  * Install a locker controller and LED in the battery-charging compartment.
  
-  * <del>Wipe down walls (very dusty)</del> +===== Bigger Tasks =====
-  * <del>Vacuum/clean cable conduits and wooden trim</del> +
-  * Wipe down cable conduits +
-  * Arrange disposal/re-homing of the desks [Al] +
-  * <del>Run a Cat5 cable from G1 ceiling space to G11 ceiling space</del> +
-  * <del>Install wifi access point in G11 and configure with VLAN for access controller [Tim]</del> +
-  * <del>Purchase electronic lock release [Al] Locks ordered 6/6/16</del> +
-  * <del>Fit electronic lock release [Costa]</del> +
-  * <del>Finish wiring access controller [Tim]</del> +
-  * <del>Order door closer [Tim]</del> +
-  * <del>Order additional shelving [Tim]</del> +
-  * <del>Fit door closer</del> +
-  * <del>Assemble additional shelving</del> +
-  * <del>Assemble 2nd round of shelving (due Fri 17th). Bolt units together this time to try and keep it straight. [Tim]</del> +
-  * Acquire server rack +
-  * <del>Assemble final two shelf units</del> +
-  * Fit twin-slot shelving over sink area - postpone, see what's left after we do the new workshop +
-  * <del>After moving existing shelf units:</del> +
-    * <del>Fit panels above shelves to prevent items falling behind them, and to secure to the wall [Costa]</del> +
-  * Source a pull-handle and build a capacitive touch sensor +
-  * Fit PIR sensor <del>and door-closed sensor</del> to G11 [Tim] +
-  * Final clear-out from G8 to G11+
  
-G8:+These should be immediately actionable, describable in a single bullet point and take 1-3 hours for 1-2 people to complete:
  
-  * Measure room and create a plan in Sweet Home 3D +  * Pull additional Cat5 cables from between G11 and G14. 
-  * Agree new layout [**EVERYONE**] +  * Specify and purchase shelving for G14 (full-lengths, 300mm depth).
-  * Build and install fitted workbench +
-  * Install wall-mounted tool boards +
-  * Install wall-mounted shelves +
-  * Build an air filtering system to capture dust (since G8 doesn't have extraction or a window) +
-  * Build a dust extraction system to capture dust from the power tools +
-  * Purchase and install sensitive smoke alarm(sto warn us before we cause a building evacuation+
  
-Financial:+===== Infrastructure Projects =====
  
-  * Recruit more members to help us pay for the room [**EVERYONE**+More tasks may be found on the [[start#projects|infrastructure project pages]]. 
-  * Notify council of status change and apply for rates discount+ 
 +===== Mini Projects ===== 
 + 
 +Projects might require planning or additional purchases before they can be tackled. Some projects will need their own pages and a link from here. 
 + 
 +==== Repair Tektronix oscilloscope ==== 
 + 
 +Scope has a power supply fault, and probably needs a capacitor replacement. 
 + 
 +==== Repair Rigol DS1102D oscilloscope ==== 
 + 
 +One channel has failed, believed to be in the front-end. Device is out of warranty and Rigol cannot offer replacement parts that would be economically worth-while. 
 + 
 +This schematic might help: http://rigol.codenaschen.de/index.php/Schematics
  
 ===== Other Stuff ===== ===== Other Stuff =====
  
   * Design a test pattern for checking/calibrating the laser cutter   * Design a test pattern for checking/calibrating the laser cutter
-  * Update OpenStreepMap to identify all the local takeaways +  * Build a webapp to view [[http://spaceapi.net|Space API]] data 
-  * Make some door wedges+
todo.txt · Last modified: 2022-07-04 19:30 by MirZa

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki