todo
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
todo [2016-09-11 22:55] – tim | todo [2016-09-27 09:45] – tim | ||
---|---|---|---|
Line 1: | Line 1: | ||
====== Things To Do / How Can I Help? ====== | ====== Things To Do / How Can I Help? ====== | ||
- | ===== New Room ===== | + | ===== Mini Projects |
- | G11: | + | ==== Fit shelving under G8 workbenches ==== |
- | * Fit PIR sensor < | + | We want to install shelving under the section of workbench to the right of the drill press. Just one shelf, to divide the space into two. |
- | G8: | + | Status: Tim has fitted a frame and started cutting the boards to make the shelves. |
- | * Arrange disposal/ | + | ==== Drill organisation ==== |
- | * < | + | |
- | * Fit an external extractor fan (permission | + | All of our drills (bits) currently sit in a single box. We should have a storage system for making it easier to find the right type and size, and to see what we have or what is missing. |
- | * Build a dust extraction | + | |
- | * Purchase | + | * Make or buy an organiser: |
- | * Build a standalone workbench | + | * Multiple holes for each size of drill (because one drill of each size is not enough for a hackerspace) |
- | * Fit shelf under right-section of new workbenches | + | * Sections for HSS, brad-point and masonry |
+ | * Audit the drills. Dispose of bad ones. Sharpen where possible. Identify what we need to purchase for replacements/ | ||
+ | * Identify a suitable drill sharpening system to keep the drills in good condition. | ||
+ | |||
+ | ==== Install ventilation in G8 Workshop ==== | ||
+ | |||
+ | We have permission | ||
+ | |||
+ | * Plan how to remove the bricks safely and without damaging the rest of the wall. | ||
+ | * Source | ||
+ | * Do the work... | ||
+ | * Clean/ | ||
+ | |||
+ | ==== Relocate | ||
+ | |||
+ | The extract vent is currently located in the left corner as you enter the room. It should be relocate | ||
+ | |||
+ | ==== Finish moving the workshop | ||
+ | |||
+ | * Mount the wall-mounted bins in G8 | ||
+ | * Move the tools and supplies from G2 to G8 | ||
+ | * Organise the shelves in G8, label them so tools can be returned to the same place each time. | ||
+ | * Move the chemicals from G1 to G8 (under the sink). Dispose of empty containers. | ||
+ | * Fit a smoke alarm in G8 (early warning system to avoid causing an evac of Summerhall). | ||
===== Other Stuff ===== | ===== Other Stuff ===== | ||
Line 22: | Line 45: | ||
* Update OpenStreepMap to identify all the local takeaways | * Update OpenStreepMap to identify all the local takeaways | ||
* Sort the PC parts and peripherals | * Sort the PC parts and peripherals | ||
- | * < | + |
todo.txt · Last modified: 2022-07-04 19:30 by MirZa