====== Things To Do / How Can I Help? ====== | ====== Things To Do / How Can I Help? ====== | ||
- | ===== New Room ===== | + | ===== Mini Projects |
- | G11: | + | ==== Drill organisation ==== |
- | * Fit PIR sensor <del>and door-closed sensor</ | + | All of our drills (bits) currently sit in a single box. We should have a storage system for making it easier to find the right type and size, and to see what we have or what is missing. |
- | G8: | + | * Make or buy an organiser: |
+ | * Multiple holes for each size of drill (because one drill of each size is not enough for a hackerspace) | ||
+ | * Sections for HSS, brad-point and masonry | ||
+ | * Audit the drills. Dispose of bad ones. Sharpen where possible. Identify what we need to purchase for replacements/ | ||
+ | * Identify a suitable drill sharpening system to keep the drills in good condition. | ||
- | * Arrange disposal/re-homing | + | ==== Install ventilation in G8 Workshop ==== |
- | * < | + | |
- | * Fit an external extractor | + | We have permission from Summerhall to install a fan in the external wall. There are two sections where previous vents have been bricked-up, and one of these should be opened and a fan installed. |
- | * Build a dust extraction | + | |
- | * Purchase | + | * Plan how to remove the bricks safely and without damaging the rest of the wall. |
- | * Build a standalone workbench | + | * Source a suitable |
- | * Fit shelf under right-section of new workbenches | + | * Do the work... |
+ | * Clean/ | ||
+ | |||
+ | ==== Relocate | ||
+ | |||
+ | The extract vent is currently located in the left corner as you enter the room. It should be relocate | ||
+ | |||
+ | ==== Finish moving the workshop | ||
+ | |||
+ | * Mount the wall-mounted bins in G8 | ||
+ | * Move the tools and supplies from G2 to G8 | ||
+ | * Organise the shelves in G8, label them so tools can be returned to the same place each time. | ||
+ | * Move the chemicals from G1 to G8 (under the sink). Dispose of empty containers. | ||
+ | * Fit a smoke alarm in G8 (early warning system to avoid causing an evac of Summerhall). | ||
===== Other Stuff ===== | ===== Other Stuff ===== | ||
Line 22: | Line 39: | ||
* Update OpenStreepMap to identify all the local takeaways | * Update OpenStreepMap to identify all the local takeaways | ||
* Sort the PC parts and peripherals | * Sort the PC parts and peripherals | ||
- | * < | + | * Build a webapp to view [[http:// |
+ | |||
+ | ===== Completed Projects ===== | ||
+ | |||
+ | ==== Fit shelving under G8 workbenches ==== | ||
+ | |||
+ | We want to install shelving under the section of workbench to the right of the drill press. Just one shelf, to divide the space into two. | ||
+ |