User Tools

Site Tools


todo

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Next revisionBoth sides next revision
todo [2016-09-11 22:55] timtodo [2019-08-06 10:06] – [Small Tasks] tim
Line 1: Line 1:
-====== Things To Do How Can Help? ======+====== To-Do (How can help?======
  
-===== New Room =====+See also [[https://roundup.ehlab.uk/|Roundup]] and the [[members_nights|Members' Nights]] list.
  
-G11:+===== Small Tasks =====
  
-  * Fit PIR sensor <del>and door-closed sensor</del> to G11 [Tim]+These should be immediately actionable, describable in a single bullet point and take up to 30 minutes for one person to complete:
  
-G8:+  * <del>Inspect the fly zapper. If no issues found order new tubes.</del>  
 +  * <del>Install new tubes in the fly zapper.</del> 
 +  * Install a small shelf in the battery-charging compartment of the workshop. Shelf should be high enough to be out of the way and with just enough room to store a row of batteries. 
 +  * Tidy and clear-out the kitchen cupboard. Should only contain cleaning supplies. 
 +  * G1 hifi shelvesreplace the short brackets with long brackets (we have a surplus and the shelf would be more secure). 
 +  * Laser Cutter #1: Connect the air-flow sensor into the safety loop (in series with the lid switch, water flow sensor, etc). 
 +  * <del>Laser cut the remaining tool locker doors and mounting plates.</del> 
 +  * Wire-up power supplies for tool lockers and PAT test 
 +===== Bigger Tasks =====
  
-  * Arrange disposal/re-homing of the desks [Al] +These should be immediately actionable, describable in a single bullet point and take 1-3 hours for 1-2 people to complete: 
-  * <del>Build an air filtering system to capture dust (since G8 doesn't have extraction or a window)</del> + 
-    * Fit an external extractor fan (permission has been granted by Summerhall) +  * Pull <del>4</del> 3 CAT5e cables from G11 rack to G14 <del>and install the access point.</del> 
-  * Build a dust extraction system to capture dust from the power tools +  <del>Fit twin-slot shelf rails in G14.</del> 
-  * Purchase and install sensitive smoke alarm(s) to warn us before we cause building evacuation + 
-  * Build standalone workbench (either 150x75cm or 180x75cm) +===== Infrastructure Projects ===== 
-  * Fit shelf under right-section of new workbenches (40cm depth, wall-mounted)+ 
 +More tasks may be found on the [[start#projects|infrastructure project pages]]. 
 + 
 +===== Mini Projects ===== 
 + 
 +Projects might require planning or additional purchases before they can be tackled. Some projects will need their own pages and link from here. 
 + 
 +==== Repair Tektronix oscilloscope ==== 
 + 
 +Scope has power supply fault, and probably needs a capacitor replacement. 
 + 
 +==== Repair Rigol DS1102D oscilloscope ==== 
 + 
 +One channel has failed, believed to be in the front-end. Device is out of warranty and Rigol cannot offer replacement parts that would be economically worth-while. 
 + 
 +This schematic might help: http://rigol.codenaschen.de/index.php/Schematics
  
 ===== Other Stuff ===== ===== Other Stuff =====
  
   * Design a test pattern for checking/calibrating the laser cutter   * Design a test pattern for checking/calibrating the laser cutter
-  * Update OpenStreepMap to identify all the local takeaways +  * Build a webapp to view [[http://spaceapi.net|Space API]] data 
-  * Sort the PC parts and peripherals +
-  * <del>Make some door wedges</del>+
todo.txt · Last modified: 2022-07-04 19:30 by MirZa

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki