todo
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
todo [2016-09-11 22:55] – tim | todo [2019-08-29 14:53] – [Bigger Tasks] tim | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | ====== | + | ====== To-Do (How can I help?) ====== |
- | ===== New Room ===== | + | See also [[https:// |
- | G11: | + | ===== Small Tasks ===== |
- | * Fit PIR sensor <del>and door-closed sensor</ | + | These should be immediately actionable, describable in a single bullet point and take up to 30 minutes for one person to complete: |
- | G8: | + | * Tidy and clear-out the kitchen cupboard. Should only contain cleaning supplies. |
+ | * G1 hifi shelves: replace the short brackets with long brackets (we have a surplus and the shelf would be more secure). | ||
+ | * Laser Cutter #1: Connect the air-flow sensor into the safety loop (in series with the lid switch, water flow sensor, etc). | ||
+ | * Wire-up LEDs for one remaining tool locker. | ||
+ | * Secure tool locker LED wiring with hot glue (at the point where the wires meet the LED strip). | ||
+ | * Install a locker controller and LED in the battery-charging compartment. | ||
- | * Arrange disposal/ | + | ===== Bigger Tasks ===== |
- | * < | + | |
- | * Fit an external extractor fan (permission has been granted by Summerhall) | + | These should be immediately actionable, describable in a single bullet point and take 1-3 hours for 1-2 people to complete: |
- | * Build a dust extraction system to capture dust from the power tools | + | |
- | * Purchase | + | * Pull additional Cat5 cables |
- | * Build a standalone workbench (either 150x75cm or 180x75cm) | + | * Specify |
- | * Fit shelf under right-section of new workbenches (40cm depth, wall-mounted) | + | * Install spur for G1 water heater. |
+ | * Tidy-up the radio corner. | ||
+ | ===== Infrastructure Projects ===== | ||
+ | |||
+ | More tasks may be found on the [[start# | ||
+ | |||
+ | ===== Mini Projects ===== | ||
+ | |||
+ | Projects might require planning or additional purchases before they can be tackled. Some projects will need their own pages and a link from here. | ||
+ | |||
+ | ==== Repair Tektronix oscilloscope ==== | ||
+ | |||
+ | Scope has a power supply fault, and probably needs a capacitor replacement. | ||
+ | |||
+ | ==== Repair Rigol DS1102D oscilloscope ==== | ||
+ | |||
+ | One channel has failed, believed to be in the front-end. Device is out of warranty and Rigol cannot offer replacement parts that would be economically worth-while. | ||
+ | |||
+ | This schematic might help: http:// | ||
===== Other Stuff ===== | ===== Other Stuff ===== | ||
* Design a test pattern for checking/ | * Design a test pattern for checking/ | ||
- | * Update OpenStreepMap | + | * Build a webapp |
- | * Sort the PC parts and peripherals | + | |
- | * < | + |
todo.txt · Last modified: 2022-07-04 19:30 by MirZa