todo

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Next revisionBoth sides next revision
todo [2016-09-11 22:55] timtodo [2019-10-30 00:56] – moved "replace taps" back to open issues MirZa
Line 1: Line 1:
-====== Things To Do How Can Help? ======+====== To-Do (How can help?======
  
-===== New Room =====+See also the [[members_nights|Members' Nights]] list.
  
-G11:+===== Small Tasks =====
  
-  * Fit PIR sensor <del>and door-closed sensor</del> to G11 [Tim]+These should be immediately actionable, describable in a single bullet point and take up to 30 minutes for one person to complete:
  
-G8:+  * Tidy and clear-out the kitchen cupboard. Should only contain cleaning supplies. 
 +  * G1 hifi shelvesreplace the short brackets with long brackets (we have a surplus and the shelf would be more secure). 
 +  * Laser Cutter #1: Connect the air-flow sensor into the safety loop (in series with the lid switch, water flow sensor, etc). 
 +  * Move G6 (Al's room) access point to G11.
  
-  * Arrange disposal/re-homing of the desks [Al] + 
-  * <del>Build an air filtering system to capture dust (since G8 doesn't have extraction or window)</del> +===== Bigger Tasks ===== 
-    * Fit an external extractor fan (permission has been granted by Summerhall) + 
-  * Build a dust extraction system to capture dust from the power tools +These should be immediately actionable, describable in single bullet point and take 1-3 hours for 1-2 people to complete: 
-  * Purchase and install sensitive smoke alarm(sto warn us before we cause a building evacuation + 
-  * Build a standalone workbench (either 150x75cm or 180x75cm) +  * Pull additional Cat5 cables from between G11 and G14. 
-  * Fit shelf under right-section of new workbenches (40cm depthwall-mounted)+  * Specify and purchase shelving for G14 (full-lengths, 300mm depth). 
 +  * Install spur for G1 water heater. 
 +  * Tidy-up the radio corner. 
 +===== Infrastructure Projects ===== 
 + 
 +More tasks may be found on the [[start#projects|infrastructure project pages]]. 
 + 
 +===== Mini Projects ===== 
 + 
 +Projects might require planning or additional purchases before they can be tackled. Some projects will need their own pages and a link from here. 
 + 
 +==== Repair Tektronix oscilloscope ==== 
 + 
 +Scope has a power supply faultand probably needs a capacitor replacement. 
 + 
 +==== Repair Rigol DS1102D oscilloscope ==== 
 + 
 +One channel has failed, believed to be in the front-end. Device is out of warranty and Rigol cannot offer replacement parts that would be economically worth-while. 
 + 
 +This schematic might help: http://rigol.codenaschen.de/index.php/Schematics
  
 ===== Other Stuff ===== ===== Other Stuff =====
  
   * Design a test pattern for checking/calibrating the laser cutter   * Design a test pattern for checking/calibrating the laser cutter
-  * Update OpenStreepMap to identify all the local takeaways +  * Build a webapp to view [[http://spaceapi.net|Space API]] data 
-  * Sort the PC parts and peripherals + 
-  * <del>Make some door wedges</del>+===== Roundup ===== 
 + 
 +The roundup tracker has been dropped due to lack of use. The archived list of open issues is as follows: 
 + 
 + 
 + 
 +^ id ^ activity ^ title ^ creator ^ assigned to ^ status ^ 
 +| 94 | 2018-06-03.16:36:02 | COSHH Register / Chemicals | 22 | None | 3 | 
 +| 99 | 2018-06-03.10:17:27 | Fire safety policy | 22 | None | 3 | 
 +| 93 | 2018-06-03.10:09:49 | Update health and safety policy | 22 | None | 3 | 
 +| 95 | 2018-06-03.10:05:17 | Near miss / accident register & policy | 22 | None | 3 | 
 +| 98 | 2018-06-03.09:31:42 | Electrical Testing / PAT Testing policy / training | 22 | 22 | 3 | 
 +| 96 | 2018-06-03.09:21:59 | Electrical Safety Policy | 22 | None | 3 | 
 +| 54 | 2017-12-08.15:50:13 | Create training docs for mitre saw | 4 | None | 1 | 
 +| 52 | 2017-12-08.15:49:11 | Create training docs for table saw | 4 | None | 1 | 
 +| 56 | 2018-08-04.18:02:06 | Create training docs for bantam lathe | 4 | None | 3 | 
 +| 17 | 2018-06-28.15:45:34 | Tidy roof radio/network equipment | 3 | None | 3 | 
 +| 73 | 2018-04-27.12:15:35 | Maintenance on Block B roof ladder | 3 | None | 1 | 
 +| 79 | 2018-04-14.20:48:15 | Fix Ultimaker 2 LED Strips | 23 | None | 1 | 
 +| 11 | 2018-01-19.00:04:51 | Repair Tektronix oscilloscope | 3 | None | 3 | 
 +| 18 | 2018-01-04.22:31:50 | Dismantle digital waterfall | 3 | None | 5 | 
 +| 33 | 2017-06-28.00:23:48 | Organise chemical storage and COSHH docs | 3 | None | 1 | 
 +| 32 | 2017-06-27.23:46:31 | Organise cleaning cupboard | 3 | None | 1 | 
 +| 97 | 2018-06-03.09:28:59 | Membership Policy | 21 | 21 | 1 | 
 +| 28 | 2018-05-22.09:46:27 | Close out the milling pledge | 4 | None | 5 | 
 +| 9 | 2018-05-22.09:46:13 | Collect remaining mitre saw pledges | 3 | None | 5 | 
 +| 67 | 2018-05-01.19:57:43 | Remote antenna switch for roof->g1 downlink | 3 | None | 3 | 
 +| 89 | 2018-04-25.13:30:09 | Mailman 3 mailing lists | 3 | 3 | 3 | 
 +| 20 | 2018-01-26.14:54:24 | Deploy Loomio for trial | 3 | 3 | 3 | 
 +| 104 | 2019-05-17.14:30:44 | (Sliding) doors under benches in G8 | 45 | None | 1 | 
 +| 63 | 2018-12-18.14:30:07 | Build new test lead organisation fixture | 23 | None | 3 | 
 +| 69 | 2018-07-18.13:23:09 | SatNOGS station | 3 | None | 3 | 
 +| 47 | 2018-04-28.15:54:46 | Test/fix reflow oven | 4 | None | 3 | 
 +| 92 | 2018-04-27.12:10:08 | Name Badge Printer / Visitor Sign In | 22 | None | 1 | 
 +| 90 | 2018-04-25.14:42:53 | Consumables Inventory | 23 | None | 3 | 
 +| 61 | 2018-03-31.05:57:11 | Build new terminal unit for HP bench power supply | 3 | None | 3 | 
 +| 26 | 2018-03-03.01:07:58 | Install roof-top weather station | 3 | 10 | 3 | 
 +| 60 | 2018-01-25.15:21:14 | Obtain BNC cables and such for Oscilloscope/Signal Generators | 23 | None | 3 | 
 +| 58 | 2018-01-03.00:14:14 | Purchase vacuum desoldering pump | 3 | None | 1 | 
 +| 30 | 2017-06-11.16:09:24 | 3D Printing Supplies | 15 | 15 | 1 | 
 +| 70 | 2018-01-26.03:13:28 | Fix CNC spindle probe | 4 | 4 | 5 | 
 +| 87 | 2018-04-24.18:00:42 | CNC router z-axis counterweight or brake | 4 | None | 1 | 
 +| 83 | 2018-04-24.18:17:54 | Spindle/VFD control from LinuxCNC | 4 | None | 1 | 
 +| 86 | 2018-04-24.18:17:45 | Tool touchoff pad for the CNC router | 4 | None | 1 | 
 +| 59 | 2018-02-02.15:45:46 | Replace taps in G8 and G11 | 21 | None | 3 | 
 + 
 +(Mostly) Done tasks 
 +^ id ^ activity ^ title ^ creator ^ assigned to ^ status ^ 
 +| 4 | 2017-04-24.14:00:20 | Fix the NovaTurn CNC lathe | 4 | None | 1 | 
 +| 102 | 2019-03-23.11:45:06 | test subject | 3 | 3 | 3 | 
 +| 39 | 2019-03-09.18:45:32 | "Update ""Facilities"" page on the website" | 19 | None | 3 | 
 +| 88 | 2018-04-24.18:02:49 | Set up PC for the CNC router | 4 | None | 1 | 
 +| 85 | 2018-04-24.17:56:03 | CNC router dust extraction | 4 | None | 1 | 
 +| 84 | 2018-04-24.17:55:39 | CNC router power/e-stop wiring | 4 | None | 3 | 
 +| 82 | 2018-04-24.17:47:53 | Watercooling for the CNC router | 4 | None | 1 | 
 +| 76 | 2019-06-09.10:00:41 | NFC tool lockers | 3 | None | 3 | 
 +| 21 | 2018-06-03.18:42:30 | Tool access controllers | 3 | 3 | 5 | 
 +| 24 | 2018-04-13.09:54:56 | Automated do-not-hack stickers | 3 | 3 | 3 | 
 +| 91 | 2018-04-27.12:03:35 | Hot Water for G1 | 3 | None | 3 |
todo.txt · Last modified: 2022-07-04 19:30 by MirZa