Line 2: | Line 2: | ||
===== Mini Projects ===== | ===== Mini Projects ===== | ||
- | |||
- | ==== Fit shelving under G8 workbenches ==== | ||
- | |||
- | Status: in progress, Tim | ||
==== Drill organisation ==== | ==== Drill organisation ==== | ||
Line 16: | Line 12: | ||
* Audit the drills. Dispose of bad ones. Sharpen where possible. Identify what we need to purchase for replacements/ | * Audit the drills. Dispose of bad ones. Sharpen where possible. Identify what we need to purchase for replacements/ | ||
* Identify a suitable drill sharpening system to keep the drills in good condition. | * Identify a suitable drill sharpening system to keep the drills in good condition. | ||
+ | |||
+ | ==== Finish moving the workshop from G2 to G8 ==== | ||
+ | |||
+ | * Clean the blue storage bins in G8 | ||
+ | * Move the tools and supplies from G2 to G8 | ||
+ | * Organise the shelves in G8, label them so tools can be returned to the same place each time. | ||
+ | * Move the chemicals from G1 to G8 (under the sink). Dispose of empty containers. | ||
+ | * Fit a smoke alarm in G8 (early warning system to avoid causing an evac of Summerhall). | ||
+ | |||
+ | ===== Other Stuff ===== | ||
+ | |||
+ | * Design a test pattern for checking/ | ||
+ | * Update OpenStreepMap to identify all the local takeaways | ||
+ | * Sort the PC parts and peripherals | ||
+ | * Build a webapp to view [[http:// | ||
+ | |||
+ | ---- | ||
+ | |||
+ | ===== Completed Projects ===== | ||
+ | |||
+ | ==== Fit shelving under G8 workbenches ==== | ||
+ | |||
+ | We want to install shelving under the section of workbench to the right of the drill press. Just one shelf, to divide the space into two. | ||
+ | |||
+ | ==== Relocate extraction vent in G11 Store Room ==== | ||
+ | |||
+ | The extract vent is currently located in the left corner as you enter the room. It should be relocate to the tile above the rear of the server rack, to better capture the hot air. We have an extra length of flexible hose that should enable this. | ||
==== Install ventilation in G8 Workshop ==== | ==== Install ventilation in G8 Workshop ==== | ||
Line 26: | Line 49: | ||
* Clean/ | * Clean/ | ||
- | ===== New Room ===== | ||
- | G11: | ||
- | |||
- | * Fit PIR sensor < | ||
- | |||
- | G8: | ||
- | |||
- | * Arrange disposal/ | ||
- | * < | ||
- | * Fit an external extractor fan (permission has been granted by Summerhall) | ||
- | * Build a dust extraction system to capture dust from the power tools | ||
- | * Purchase and install sensitive smoke alarm(s) to warn us before we cause a building evacuation | ||
- | * Build a standalone workbench (either 150x75cm or 180x75cm) | ||
- | * Fit shelf under right-section of new workbenches (40cm depth, wall-mounted) | ||
- | |||
- | ===== Other Stuff ===== | ||
- | |||
- | * Design a test pattern for checking/ | ||
- | * Update OpenStreepMap to identify all the local takeaways | ||
- | * Sort the PC parts and peripherals | ||
- | * < |