todo
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
todo [2016-09-27 09:32] – tim | todo [2019-07-09 12:01] – tim | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | ====== | + | ====== To-Do (How can I help?) ====== |
- | ===== Mini Projects ===== | + | See also https:// |
- | ==== Fit shelving under G8 workbenches | + | ===== Small Tasks ===== |
- | Status: in progress, Tim | + | These should take up to 30 minutes for one person to complete, and be describable in a single bullet point. |
- | ==== Drill organisation ==== | + | * |
- | All of our drills (bits) currently sit in a single box. We should have a storage system for making it easier to find the right type and size, and to see what we have or what is missing. | + | ===== Mini Projects ===== |
- | * Make or buy an organiser: | + | ==== Repair Tektronix oscilloscope ==== |
- | * Multiple holes for each size of drill (because one drill of each size is not enough for a hackerspace) | + | |
- | * Sections for HSS, brad-point and masonry | + | |
- | * Audit the drills. Dispose of bad ones. Sharpen where possible. Identify what we need to purchase for replacements/ | + | |
- | * Identify a suitable drill sharpening system to keep the drills in good condition. | + | |
- | ==== Install ventilation in G8 Workshop ==== | + | Scope has a power supply fault, and probably needs a capacitor replacement. |
- | We have permission from Summerhall to install a fan in the external wall. There are two sections where previous vents have been bricked-up, and one of these should be opened and a fan installed. | + | ==== Repair Rigol DS1102D oscilloscope ==== |
- | * Plan how to remove | + | One channel has failed, believed |
- | * Source a suitable fan. | + | |
- | * Do the work... | + | |
- | * Clean/ | + | |
- | ===== New Room ===== | + | This schematic might help: http://rigol.codenaschen.de/ |
- | + | ||
- | G11: | + | |
- | + | ||
- | * Fit PIR sensor < | + | |
- | + | ||
- | G8: | + | |
- | + | ||
- | * Arrange disposal/re-homing of the desks [Al] | + | |
- | * < | + | |
- | * Fit an external extractor fan (permission has been granted by Summerhall) | + | |
- | * Build a dust extraction system to capture dust from the power tools | + | |
- | * Purchase and install sensitive smoke alarm(s) to warn us before we cause a building evacuation | + | |
- | * Build a standalone workbench (either 150x75cm or 180x75cm) | + | |
- | * Fit shelf under right-section of new workbenches (40cm depth, wall-mounted) | + | |
===== Other Stuff ===== | ===== Other Stuff ===== | ||
* Design a test pattern for checking/ | * Design a test pattern for checking/ | ||
- | * Update OpenStreepMap | + | * Build a webapp |
- | * Sort the PC parts and peripherals | + | |
- | * < | + |
todo.txt · Last modified: 2022-07-04 19:30 by MirZa