todo
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
todo [2016-09-27 09:38] – tim | todo [2019-07-09 12:13] – tim | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | ====== | + | ====== To-Do (How can I help?) ====== |
- | ===== Mini Projects ===== | + | See also [[https:// |
- | ==== Fit shelving under G8 workbenches | + | ===== Small Tasks ===== |
- | Status: in progress, Tim | + | These should be immediately actionable, describable in a single bullet point and take up to 30 minutes for one person to complete: |
- | ==== Drill organisation ==== | + | * |
- | All of our drills (bits) currently sit in a single box. We should have a storage system for making it easier to find the right type and size, and to see what we have or what is missing. | + | ===== Bigger Tasks ===== |
- | * Make or buy an organiser: | + | These should be immediately actionable, describable in a single bullet |
- | * Multiple holes for each size of drill (because one drill of each size is not enough for a hackerspace) | + | |
- | * Sections for HSS, brad-point and masonry | + | |
- | * Audit the drills. Dispose of bad ones. Sharpen where possible. Identify what we need to purchase | + | |
- | * Identify a suitable drill sharpening system | + | |
- | ==== Install ventilation in G8 Workshop ==== | + | * Pull 4 CAT5e cables from G11 rack to G14 and install the access point. |
- | We have permission from Summerhall to install a fan in the external wall. There are two sections where previous vents have been bricked-up, and one of these should be opened and a fan installed. | + | ===== Mini Projects ===== |
- | * Plan how to remove the bricks safely and without damaging the rest of the wall. | + | ==== Repair Tektronix oscilloscope ==== |
- | * Source a suitable fan. | + | |
- | * Do the work... | + | |
- | * Clean/ | + | |
- | ==== Relocate extraction vent in G11 Store Room ==== | + | Scope has a power supply fault, and probably needs a capacitor replacement. |
- | The extract vent is currently located in the left corner as you enter the room. It should be relocate to the tile above the rear of the server rack, to better capture the hot air. We have an extra length of flexible hose that should enable this. | + | ==== Repair Rigol DS1102D oscilloscope ==== |
- | ===== New Room ===== | + | One channel has failed, believed to be in the front-end. Device is out of warranty and Rigol cannot offer replacement parts that would be economically worth-while. |
- | G11: | + | This schematic might help: http://rigol.codenaschen.de/ |
- | + | ||
- | * Fit PIR sensor < | + | |
- | + | ||
- | G8: | + | |
- | + | ||
- | * Arrange disposal/re-homing of the desks [Al] | + | |
- | * < | + | |
- | * Fit an external extractor fan (permission has been granted by Summerhall) | + | |
- | * Build a dust extraction system to capture dust from the power tools | + | |
- | * Purchase and install sensitive smoke alarm(s) to warn us before we cause a building evacuation | + | |
- | * Build a standalone workbench (either 150x75cm or 180x75cm) | + | |
- | * Fit shelf under right-section of new workbenches (40cm depth, wall-mounted) | + | |
===== Other Stuff ===== | ===== Other Stuff ===== | ||
* Design a test pattern for checking/ | * Design a test pattern for checking/ | ||
- | * Update OpenStreepMap | + | * Build a webapp |
- | * Sort the PC parts and peripherals | + | |
- | * < | + |
todo.txt · Last modified: 2022-07-04 19:30 by MirZa