Line 1: | Line 1: | ||
- | ====== | + | ====== To-Do (How can I help?) ====== |
- | ===== Mini Projects ===== | + | See also [[https:// |
- | ==== Fit shelving under G8 workbenches | + | ===== Small Tasks ===== |
- | Status: in progress, Tim | + | These should be immediately actionable, describable in a single bullet point and take up to 30 minutes for one person to complete: |
- | ==== Drill organisation ==== | + | * Tidy and clear-out the kitchen cupboard. Should only contain cleaning supplies. |
+ | * G1 hifi shelves: replace the short brackets with long brackets (we have a surplus and the shelf would be more secure). | ||
+ | * Laser Cutter #1: Connect the air-flow sensor into the safety loop (in series with the lid switch, water flow sensor, etc). | ||
+ | * Wire-up LEDs for one remaining tool locker. | ||
+ | * Secure tool locker LED wiring with hot glue (at the point where the wires meet the LED strip). | ||
+ | * Move G6 (Al's room) access point to G11. | ||
- | All of our drills (bits) currently sit in a single box. We should have a storage system for making it easier to find the right type and size, and to see what we have or what is missing. | ||
- | * Make or buy an organiser: | + | ===== Bigger Tasks ===== |
- | * Multiple holes for each size of drill (because one drill of each size is not enough for a hackerspace) | + | |
- | * Sections for HSS, brad-point and masonry | + | |
- | * Audit the drills. Dispose of bad ones. Sharpen where possible. Identify what we need to purchase for replacements/ | + | |
- | * Identify a suitable drill sharpening system to keep the drills in good condition. | + | |
- | ==== Install ventilation | + | These should be immediately actionable, describable |
- | We have permission | + | * Pull additional Cat5 cables |
+ | * Specify and purchase shelving for G14 (full-lengths, 300mm depth). | ||
+ | * Install spur for G1 water heater. | ||
+ | * Tidy-up the radio corner. | ||
+ | ===== Infrastructure Projects ===== | ||
- | * Plan how to remove | + | More tasks may be found on the [[start# |
- | * Source a suitable fan. | + | |
- | * Do the work... | + | |
- | * Clean/ | + | |
- | ==== Relocate extraction vent in G11 Store Room ==== | + | ===== Mini Projects ===== |
- | The extract vent is currently located in the left corner as you enter the room. It should | + | Projects might require planning or additional purchases before they can be tackled. Some projects will need their own pages and a link from here. |
- | ===== New Room ===== | + | ==== Repair Tektronix oscilloscope |
- | G11: | + | Scope has a power supply fault, and probably needs a capacitor replacement. |
- | * Fit PIR sensor < | + | ==== Repair Rigol DS1102D oscilloscope ==== |
- | G8: | + | One channel has failed, believed to be in the front-end. Device is out of warranty and Rigol cannot offer replacement parts that would be economically worth-while. |
- | * Arrange disposal/re-homing of the desks [Al] | + | This schematic might help: http://rigol.codenaschen.de/ |
- | * < | + | |
- | * Fit an external extractor fan (permission has been granted by Summerhall) | + | |
- | * Build a dust extraction system to capture dust from the power tools | + | |
- | * Purchase and install sensitive smoke alarm(s) to warn us before we cause a building evacuation | + | |
- | * Build a standalone workbench (either 150x75cm or 180x75cm) | + | |
- | * Fit shelf under right-section of new workbenches (40cm depth, wall-mounted) | + | |
===== Other Stuff ===== | ===== Other Stuff ===== | ||
* Design a test pattern for checking/ | * Design a test pattern for checking/ | ||
- | * Update OpenStreepMap | + | * Build a webapp |
- | * Sort the PC parts and peripherals | + | |
- | * < | + |
todo.txt · Last modified: 2022-07-04 19:30 by MirZa