todo
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
todo [2016-09-27 09:38] – tim | todo [2019-10-30 00:56] – moved "replace taps" back to open issues MirZa | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | ====== | + | ====== To-Do (How can I help?) ====== |
- | ===== Mini Projects ===== | + | See also the [[members_nights|Members' |
- | ==== Fit shelving under G8 workbenches | + | ===== Small Tasks ===== |
- | Status: in progress, Tim | + | These should be immediately actionable, describable in a single bullet point and take up to 30 minutes for one person to complete: |
- | ==== Drill organisation ==== | + | * Tidy and clear-out the kitchen cupboard. Should only contain cleaning supplies. |
+ | * G1 hifi shelves: replace the short brackets with long brackets (we have a surplus and the shelf would be more secure). | ||
+ | * Laser Cutter #1: Connect the air-flow sensor into the safety loop (in series with the lid switch, water flow sensor, etc). | ||
+ | * Move G6 (Al's room) access point to G11. | ||
- | All of our drills (bits) currently sit in a single box. We should have a storage system for making it easier to find the right type and size, and to see what we have or what is missing. | ||
- | * Make or buy an organiser: | + | ===== Bigger Tasks ===== |
- | * Multiple holes for each size of drill (because one drill of each size is not enough for a hackerspace) | + | |
- | * Sections for HSS, brad-point and masonry | + | |
- | * Audit the drills. Dispose of bad ones. Sharpen where possible. Identify what we need to purchase for replacements/ | + | |
- | * Identify a suitable drill sharpening system to keep the drills in good condition. | + | |
- | ==== Install ventilation | + | These should be immediately actionable, describable |
- | We have permission | + | * Pull additional Cat5 cables |
+ | * Specify and purchase shelving for G14 (full-lengths, 300mm depth). | ||
+ | * Install spur for G1 water heater. | ||
+ | * Tidy-up the radio corner. | ||
+ | ===== Infrastructure Projects ===== | ||
- | * Plan how to remove | + | More tasks may be found on the [[start# |
- | * Source a suitable fan. | + | |
- | * Do the work... | + | |
- | * Clean/ | + | |
- | ==== Relocate extraction vent in G11 Store Room ==== | + | ===== Mini Projects ===== |
- | The extract vent is currently located in the left corner as you enter the room. It should | + | Projects might require planning or additional purchases before they can be tackled. Some projects will need their own pages and a link from here. |
- | ===== New Room ===== | + | ==== Repair Tektronix oscilloscope |
- | G11: | + | Scope has a power supply fault, and probably needs a capacitor replacement. |
- | * Fit PIR sensor < | + | ==== Repair Rigol DS1102D oscilloscope ==== |
- | G8: | + | One channel has failed, believed to be in the front-end. Device is out of warranty and Rigol cannot offer replacement parts that would be economically worth-while. |
- | * Arrange disposal/re-homing of the desks [Al] | + | This schematic might help: http://rigol.codenaschen.de/ |
- | * < | + | |
- | * Fit an external extractor fan (permission has been granted by Summerhall) | + | |
- | * Build a dust extraction system to capture dust from the power tools | + | |
- | * Purchase and install sensitive smoke alarm(s) to warn us before we cause a building evacuation | + | |
- | * Build a standalone workbench (either 150x75cm or 180x75cm) | + | |
- | * Fit shelf under right-section of new workbenches (40cm depth, wall-mounted) | + | |
===== Other Stuff ===== | ===== Other Stuff ===== | ||
* Design a test pattern for checking/ | * Design a test pattern for checking/ | ||
- | * Update | + | * Build a webapp to view [[http:// |
- | * Sort the PC parts and peripherals | + | |
- | * < | + | ===== Roundup ===== |
+ | |||
+ | The roundup tracker has been dropped due to lack of use. The archived list of open issues is as follows: | ||
+ | |||
+ | |||
+ | |||
+ | ^ id ^ activity ^ title ^ creator ^ assigned to ^ status ^ | ||
+ | | 94 | 2018-06-03.16: | ||
+ | | 99 | 2018-06-03.10: | ||
+ | | 93 | 2018-06-03.10: | ||
+ | | 95 | 2018-06-03.10: | ||
+ | | 98 | 2018-06-03.09: | ||
+ | | 96 | 2018-06-03.09: | ||
+ | | 54 | 2017-12-08.15: | ||
+ | | 52 | 2017-12-08.15: | ||
+ | | 56 | 2018-08-04.18: | ||
+ | | 17 | 2018-06-28.15: | ||
+ | | 73 | 2018-04-27.12: | ||
+ | | 79 | 2018-04-14.20: | ||
+ | | 11 | 2018-01-19.00: | ||
+ | | 18 | 2018-01-04.22: | ||
+ | | 33 | 2017-06-28.00: | ||
+ | | 32 | 2017-06-27.23: | ||
+ | | 97 | 2018-06-03.09: | ||
+ | | 28 | 2018-05-22.09: | ||
+ | | 9 | 2018-05-22.09: | ||
+ | | 67 | 2018-05-01.19: | ||
+ | | 89 | 2018-04-25.13: | ||
+ | | 20 | 2018-01-26.14: | ||
+ | | 104 | 2019-05-17.14: | ||
+ | | 63 | 2018-12-18.14: | ||
+ | | 69 | 2018-07-18.13: | ||
+ | | 47 | 2018-04-28.15: | ||
+ | | 92 | 2018-04-27.12: | ||
+ | | 90 | 2018-04-25.14: | ||
+ | | 61 | 2018-03-31.05: | ||
+ | | 26 | 2018-03-03.01: | ||
+ | | 60 | 2018-01-25.15: | ||
+ | | 58 | 2018-01-03.00: | ||
+ | | 30 | 2017-06-11.16: | ||
+ | | 70 | 2018-01-26.03: | ||
+ | | 87 | 2018-04-24.18: | ||
+ | | 83 | 2018-04-24.18: | ||
+ | | 86 | 2018-04-24.18: | ||
+ | | 59 | 2018-02-02.15: | ||
+ | |||
+ | (Mostly) Done tasks | ||
+ | ^ id ^ activity ^ title ^ creator ^ assigned | ||
+ | | 4 | 2017-04-24.14: | ||
+ | | 102 | 2019-03-23.11: | ||
+ | | 39 | 2019-03-09.18: | ||
+ | | 88 | 2018-04-24.18: | ||
+ | | 85 | 2018-04-24.17: | ||
+ | | 84 | 2018-04-24.17: | ||
+ | | 82 | 2018-04-24.17: | ||
+ | | 76 | 2019-06-09.10: | ||
+ | | 21 | 2018-06-03.18: | ||
+ | | 24 | 2018-04-13.09: | ||
+ | | 91 | 2018-04-27.12: |
todo.txt · Last modified: 2022-07-04 19:30 by MirZa