todo [2016-09-27 09:41] timtodo [2016-10-07 14:00] tim
Line 2: Line 2:
  
 ===== Mini Projects ===== ===== Mini Projects =====
- 
-==== Fit shelving under G8 workbenches ==== 
- 
-We want to install shelving under the section of workbench to the right of the drill press. Just one shelf, to divide the space into two. 
- 
-Status: Tim has fitted a frame and started cutting the boards to make the shelves. 
  
 ==== Drill organisation ==== ==== Drill organisation ====
Line 32: Line 26:
 The extract vent is currently located in the left corner as you enter the room. It should be relocate to the tile above the rear of the server rack, to better capture the hot air. We have an extra length of flexible hose that should enable this. The extract vent is currently located in the left corner as you enter the room. It should be relocate to the tile above the rear of the server rack, to better capture the hot air. We have an extra length of flexible hose that should enable this.
  
-===== New Room =====+==== Finish moving the workshop from G2 to G8 ====
  
-G11: +  * Mount the wall-mounted bins in G8 
- +  * Move the tools and supplies from G2 to G8 
-  * Fit PIR sensor <del>and door-closed sensor</del> to G11 [Tim] +  * Organise the shelves in G8, label them so tools can be returned to the same place each time. 
- +  * Move the chemicals from G1 to G8 (under the sink). Dispose of empty containers. 
-G8+  * Fit a smoke alarm in G8 (early warning system to avoid causing an evac of Summerhall).
- +
-  * Arrange disposal/re-homing of the desks [Al] +
-  * <del>Build an air filtering system to capture dust (since G8 doesn't have extraction or a window)</del> +
-    * Fit an external extractor fan (permission has been granted by Summerhall+
-  * Build dust extraction system to capture dust from the power tools +
-  * Purchase and install sensitive smoke alarm(s) to warn us before we cause a building evacuation +
-  * Build a standalone workbench (either 150x75cm or 180x75cm) +
-  * Fit shelf under right-section of new workbenches (40cm depth, wall-mounted)+
  
 ===== Other Stuff ===== ===== Other Stuff =====
Line 53: Line 39:
   * Update OpenStreepMap to identify all the local takeaways   * Update OpenStreepMap to identify all the local takeaways
   * Sort the PC parts and peripherals   * Sort the PC parts and peripherals
-  * <del>Make some door wedges</del>+  * Build a webapp to view [[http://spaceapi.net|Space API]] data 
 + 
 +===== Completed Projects ===== 
 + 
 +==== Fit shelving under G8 workbenches ==== 
 + 
 +We want to install shelving under the section of workbench to the right of the drill press. Just one shelf, to divide the space into two. 
 + 
todo.txt · Last modified: 2022-07-04 19:30 by MirZa