todo
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
todo [2016-09-27 09:41] – tim | todo [2016-10-14 15:57] – [Finish moving the workshop from G2 to G8] tim | ||
---|---|---|---|
Line 2: | Line 2: | ||
===== Mini Projects ===== | ===== Mini Projects ===== | ||
- | |||
- | ==== Fit shelving under G8 workbenches ==== | ||
- | |||
- | We want to install shelving under the section of workbench to the right of the drill press. Just one shelf, to divide the space into two. | ||
- | |||
- | Status: Tim has fitted a frame and started cutting the boards to make the shelves. | ||
==== Drill organisation ==== | ==== Drill organisation ==== | ||
Line 19: | Line 13: | ||
* Identify a suitable drill sharpening system to keep the drills in good condition. | * Identify a suitable drill sharpening system to keep the drills in good condition. | ||
- | ==== Install ventilation in G8 Workshop | + | ==== Finish moving the workshop from G2 to G8 ==== |
- | We have permission | + | * Clean the blue storage bins in G8 |
+ | * Move the tools and supplies | ||
+ | * Organise the shelves | ||
+ | * Move the chemicals from G1 to G8 (under the sink). Dispose | ||
+ | * Fit a smoke alarm in G8 (early warning system to avoid causing an evac of Summerhall). | ||
- | * Plan how to remove the bricks safely and without damaging the rest of the wall. | + | ===== Other Stuff ===== |
- | * Source a suitable fan. | + | |
- | * Do the work... | + | |
- | * Clean/ | + | |
- | ==== Relocate extraction vent in G11 Store Room ==== | + | * Design a test pattern for checking/ |
+ | * Update OpenStreepMap to identify all the local takeaways | ||
+ | * Sort the PC parts and peripherals | ||
+ | * Build a webapp to view [[http:// | ||
- | The extract vent is currently located in the left corner as you enter the room. It should be relocate to the tile above the rear of the server rack, to better capture the hot air. We have an extra length of flexible hose that should enable this. | + | ---- |
- | ===== New Room ===== | + | ===== Completed Projects |
- | G11: | + | ==== Fit shelving under G8 workbenches ==== |
- | * Fit PIR sensor < | + | We want to install shelving under the section of workbench to the right of the drill press. Just one shelf, to divide the space into two. |
- | G8: | + | ==== Relocate extraction vent in G11 Store Room ==== |
- | * Arrange disposal/ | + | The extract vent is currently located in the left corner as you enter the room. It should be relocate to the tile above the rear of the server rack, to better |
- | * < | + | |
- | * Fit an external extractor | + | ==== Install ventilation in G8 Workshop ==== |
- | * Build a dust extraction system | + | |
- | * Purchase and install sensitive smoke alarm(s) to warn us before we cause a building evacuation | + | We have permission from Summerhall to install |
- | * Build a standalone workbench (either 150x75cm or 180x75cm) | + | |
- | * Fit shelf under right-section of new workbenches (40cm depth, wall-mounted) | + | * Plan how to remove |
+ | * Source | ||
+ | * Do the work... | ||
+ | * Clean/ | ||
- | ===== Other Stuff ===== | ||
- | * Design a test pattern for checking/ | ||
- | * Update OpenStreepMap to identify all the local takeaways | ||
- | * Sort the PC parts and peripherals | ||
- | * < |
todo.txt · Last modified: 2022-07-04 19:30 by MirZa