Line 2: Line 2:
  
 ===== Mini Projects ===== ===== Mini Projects =====
- 
-==== Fit shelving under G8 workbenches ==== 
- 
-We want to install shelving under the section of workbench to the right of the drill press. Just one shelf, to divide the space into two. 
- 
-Status: Tim has fitted a frame and started cutting the boards to make the shelves. 
  
 ==== Drill organisation ==== ==== Drill organisation ====
Line 19: Line 13:
   * Identify a suitable drill sharpening system to keep the drills in good condition.   * Identify a suitable drill sharpening system to keep the drills in good condition.
  
-==== Install ventilation in G8 Workshop ====+==== Finish moving the workshop from G2 to G8 ====
  
-We have permission from Summerhall to install a fan in the external wallThere are two sections where previous vents have been bricked-up, and one of these should be opened and fan installed.+  * Clean the blue storage bins in G8 
 +  * Move the tools and supplies from G2 to G8 
 +  * Organise the shelves in G8, label them so tools can be returned to the same place each time. 
 +  * Move the chemicals from G1 to G8 (under the sink). Dispose of empty containers. 
 +  * Fit smoke alarm in G8 (early warning system to avoid causing an evac of Summerhall).
  
-  * Plan how to remove the bricks safely and without damaging the rest of the wall. +==== Repair Tektronix oscilloscope ====
-  * Source a suitable fan. +
-  * Do the work... +
-  * Clean/repaint as required.+
  
-==== Relocate extraction vent in G11 Store Room ====+Scope has a power supply fault, and probably needs a capacitor replacement.
  
-The extract vent is currently located in the left corner as you enter the room. It should be relocate to the tile above the rear of the server rack, to better capture the hot air. We have an extra length of flexible hose that should enable this.+==== Repair Rigol oscilloscope ====
  
-===== New Room =====+One channel has failed, believed to be in the front-end. Device is out of warranty and Rigol cannot offer replacement parts that would be economically worth-while.
  
-G11: +This schematic might helphttp://rigol.codenaschen.de/index.php/Schematics
- +
-  * Fit PIR sensor <del>and door-closed sensor</del> to G11 [Tim] +
- +
-G8: +
- +
-  * Arrange disposal/re-homing of the desks [Al] +
-  * <del>Build an air filtering system to capture dust (since G8 doesn't have extraction or a window)</del> +
-    * Fit an external extractor fan (permission has been granted by Summerhall) +
-  * Build a dust extraction system to capture dust from the power tools +
-  * Purchase and install sensitive smoke alarm(s) to warn us before we cause a building evacuation +
-  * Build a standalone workbench (either 150x75cm or 180x75cm) +
-  * Fit shelf under right-section of new workbenches (40cm depth, wall-mounted)+
  
 ===== Other Stuff ===== ===== Other Stuff =====
Line 53: Line 36:
   * Update OpenStreepMap to identify all the local takeaways   * Update OpenStreepMap to identify all the local takeaways
   * Sort the PC parts and peripherals   * Sort the PC parts and peripherals
-  * <del>Make some door wedges</del>+  * Build a webapp to view [[http://spaceapi.net|Space API]] data 
 + 
 +---- 
 + 
 +===== Completed Projects ===== 
 + 
 +==== Fit shelving under G8 workbenches ==== 
 + 
 +We want to install shelving under the section of workbench to the right of the drill press. Just one shelf, to divide the space into two. 
 + 
 +==== Relocate extraction vent in G11 Store Room ==== 
 + 
 +The extract vent is currently located in the left corner as you enter the room. It should be relocate to the tile above the rear of the server rack, to better capture the hot air. We have an extra length of flexible hose that should enable this. 
 + 
 +==== Install ventilation in G8 Workshop ==== 
 + 
 +We have permission from Summerhall to install a fan in the external wall. There are two sections where previous vents have been bricked-up, and one of these should be opened and a fan installed. 
 + 
 +  * Plan how to remove the bricks safely and without damaging the rest of the wall. 
 +  * Source a suitable fan. 
 +  * Do the work... 
 +  * Clean/repaint as required. 
 + 