-====== Things To Do How Can Help? ======+====== To-Do (How can help?======
  
-===== Mini Projects =====+See also https://roundup.ehlab.uk/
  
-==== Fit shelving under G8 workbenches ====+===== Small Tasks =====
  
-We want to install shelving under the section of workbench to the right of the drill press. Just one shelfto divide the space into two.+These should take up to 30 minutes for one person to completeand be describable in a single bullet point.
  
-Status: Tim has fitted a frame and started cutting the boards to make the shelves.+  *
  
-==== Drill organisation ====+===== Mini Projects =====
  
-All of our drills (bits) currently sit in a single box. We should have a storage system for making it easier to find the right type and size, and to see what we have or what is missing.+==== Repair Tektronix oscilloscope ====
  
-  * Make or buy an organiser: +Scope has power supply fault, and probably needs capacitor replacement.
-    * Multiple holes for each size of drill (because one drill of each size is not enough for hackerspace) +
-    * Sections for HSSbrad-point and masonry +
-  * Audit the drills. Dispose of bad ones. Sharpen where possible. Identify what we need to purchase for replacements/spares. +
-  * Identify suitable drill sharpening system to keep the drills in good condition.+
  
-==== Install ventilation in G8 Workshop ====+==== Repair Rigol DS1102D oscilloscope ====
  
-We have permission from Summerhall to install a fan in the external wall. There are two sections where previous vents have been bricked-up, and one of these should be opened and a fan installed.+One channel has failed, believed to be in the front-end. Device is out of warranty and Rigol cannot offer replacement parts that would be economically worth-while.
  
-  * Plan how to remove the bricks safely and without damaging the rest of the wall. +This schematic might help: http://rigol.codenaschen.de/index.php/Schematics
-  * Source a suitable fan. +
-  * Do the work... +
-  * Clean/repaint as required. +
- +
-==== Relocate extraction vent in G11 Store Room ==== +
- +
-The extract vent is currently located in the left corner as you enter the room. It should be relocate to the tile above the rear of the server rack, to better capture the hot air. We have an extra length of flexible hose that should enable this. +
- +
-===== New Room ===== +
- +
-G11: +
- +
-  * Fit PIR sensor <del>and door-closed sensor</del> to G11 [Tim] +
- +
-G8: +
- +
-  * Arrange disposal/re-homing of the desks [Al] +
-  * <del>Build an air filtering system to capture dust (since G8 doesn't have extraction or a window)</del> +
-    * Fit an external extractor fan (permission has been granted by Summerhall) +
-  * Build a dust extraction system to capture dust from the power tools +
-  * Purchase and install sensitive smoke alarm(s) to warn us before we cause a building evacuation +
-  * Build a standalone workbench (either 150x75cm or 180x75cm) +
-  * Fit shelf under right-section of new workbenches (40cm depth, wall-mounted)+
  
 ===== Other Stuff ===== ===== Other Stuff =====
  
   * Design a test pattern for checking/calibrating the laser cutter   * Design a test pattern for checking/calibrating the laser cutter
-  * Update OpenStreepMap to identify all the local takeaways +  * Build a webapp to view [[http://spaceapi.net|Space API]] data 
-  * Sort the PC parts and peripherals +
-  * <del>Make some door wedges</del>+