- | ====== | + | ====== To-Do (How can I help?) ====== |
- | ===== Mini Projects ===== | + | See also [[https:// |
- | ==== Fit shelving under G8 workbenches | + | ===== Small Tasks ===== |
- | We want to install shelving under the section of workbench to the right of the drill press. Just one shelf, | + | These should be immediately actionable, describable in a single bullet point and take up to 30 minutes for one person |
- | Status: Tim has fitted a frame and started cutting the boards to make the shelves. | + | * |
- | ==== Drill organisation | + | ===== Bigger Tasks ===== |
- | All of our drills (bits) currently sit in a single | + | These should be immediately actionable, describable |
- | * Make or buy an organiser: | + | * Pull 4 CAT5e cables from G11 rack to G14 and install |
- | * Multiple holes for each size of drill (because one drill of each size is not enough for a hackerspace) | + | |
- | * Sections for HSS, brad-point | + | |
- | * Audit the drills. Dispose of bad ones. Sharpen where possible. Identify what we need to purchase for replacements/ | + | |
- | * Identify a suitable drill sharpening system to keep the drills in good condition. | + | |
- | ==== Install ventilation in G8 Workshop | + | ===== Mini Projects ===== |
- | We have permission from Summerhall to install a fan in the external wall. There are two sections where previous vents have been bricked-up, and one of these should be opened | + | Projects might require planning or additional purchases before they can be tackled. Some projects will need their own pages and a link from here. |
- | * Plan how to remove the bricks safely and without damaging the rest of the wall. | + | ==== Repair Tektronix oscilloscope ==== |
- | * Source a suitable fan. | + | |
- | * Do the work... | + | |
- | * Clean/ | + | |
- | ==== Relocate extraction vent in G11 Store Room ==== | + | Scope has a power supply fault, and probably needs a capacitor replacement. |
- | The extract vent is currently located in the left corner as you enter the room. It should be relocate to the tile above the rear of the server rack, to better capture the hot air. We have an extra length of flexible hose that should enable this. | + | ==== Repair Rigol DS1102D oscilloscope ==== |
- | ===== New Room ===== | + | One channel has failed, believed to be in the front-end. Device is out of warranty and Rigol cannot offer replacement parts that would be economically worth-while. |
- | G11: | + | This schematic might help: http://rigol.codenaschen.de/ |
- | + | ||
- | * Fit PIR sensor < | + | |
- | + | ||
- | G8: | + | |
- | + | ||
- | * Arrange disposal/re-homing of the desks [Al] | + | |
- | * < | + | |
- | * Fit an external extractor fan (permission has been granted by Summerhall) | + | |
- | * Build a dust extraction system to capture dust from the power tools | + | |
- | * Purchase and install sensitive smoke alarm(s) to warn us before we cause a building evacuation | + | |
- | * Build a standalone workbench (either 150x75cm or 180x75cm) | + | |
- | * Fit shelf under right-section of new workbenches (40cm depth, wall-mounted) | + | |
===== Other Stuff ===== | ===== Other Stuff ===== | ||
* Design a test pattern for checking/ | * Design a test pattern for checking/ | ||
- | * Update OpenStreepMap | + | * Build a webapp |
- | * Sort the PC parts and peripherals | + | |
- | * < | + |