User Tools

Site Tools


todo

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Next revisionBoth sides next revision
todo [2016-09-27 09:41] timtodo [2019-08-29 14:53] – [Bigger Tasks] tim
Line 1: Line 1:
-====== Things To Do How Can Help? ======+====== To-Do (How can help?======
  
-===== Mini Projects =====+See also [[https://roundup.ehlab.uk/|Roundup]] and the [[members_nights|Members' Nights]] list.
  
-==== Fit shelving under G8 workbenches ====+===== Small Tasks =====
  
-We want to install shelving under the section of workbench to the right of the drill press. Just one shelf, to divide the space into two.+These should be immediately actionable, describable in a single bullet point and take up to 30 minutes for one person to complete:
  
-StatusTim has fitted frame and started cutting the boards to make the shelves.+  * Tidy and clear-out the kitchen cupboard. Should only contain cleaning supplies. 
 +  * G1 hifi shelvesreplace the short brackets with long brackets (we have surplus and the shelf would be more secure). 
 +  * Laser Cutter #1: Connect the air-flow sensor into the safety loop (in series with the lid switch, water flow sensor, etc). 
 +  * Wire-up LEDs for one remaining tool locker. 
 +  * Secure tool locker LED wiring with hot glue (at the point where the wires meet the LED strip). 
 +  * Install a locker controller and LED in the battery-charging compartment.
  
-==== Drill organisation ====+===== Bigger Tasks =====
  
-All of our drills (bits) currently sit in a single box. We should have a storage system for making it easier to find the right type and size, and to see what we have or what is missing.+These should be immediately actionable, describable in a single bullet point and take 1-3 hours for 1-2 people to complete:
  
-  * Make or buy an organiser: +  * Pull additional Cat5 cables from between G11 and G14. 
-    Multiple holes for each size of drill (because one drill of each size is not enough for a hackerspace) +  Specify and purchase shelving for G14 (full-lengths, 300mm depth). 
-    * Sections for HSS, brad-point and masonry +  * Install spur for G1 water heater
-  * Audit the drills. Dispose of bad ones. Sharpen where possible. Identify what we need to purchase for replacements/spares+  * Tidy-up the radio corner. 
-  * Identify a suitable drill sharpening system to keep the drills in good condition.+===== Infrastructure Projects =====
  
-==== Install ventilation in G8 Workshop ====+More tasks may be found on the [[start#projects|infrastructure project pages]].
  
-We have permission from Summerhall to install a fan in the external wall. There are two sections where previous vents have been bricked-up, and one of these should be opened and a fan installed.+===== Mini Projects =====
  
-  * Plan how to remove the bricks safely and without damaging the rest of the wall. +Projects might require planning or additional purchases before they can be tackled. Some projects will need their own pages and a link from here.
-  * Source suitable fan. +
-  * Do the work... +
-  * Clean/repaint as required.+
  
-==== Relocate extraction vent in G11 Store Room ====+==== Repair Tektronix oscilloscope ====
  
-The extract vent is currently located in the left corner as you enter the room. It should be relocate to the tile above the rear of the server rackto better capture the hot air. We have an extra length of flexible hose that should enable this.+Scope has a power supply faultand probably needs a capacitor replacement.
  
-===== New Room =====+==== Repair Rigol DS1102D oscilloscope ====
  
-G11:+One channel has failed, believed to be in the front-end. Device is out of warranty and Rigol cannot offer replacement parts that would be economically worth-while.
  
-  * Fit PIR sensor <del>and door-closed sensor</del> to G11 [Tim] +This schematic might helphttp://rigol.codenaschen.de/index.php/Schematics
- +
-G8: +
- +
-  * Arrange disposal/re-homing of the desks [Al] +
-  * <del>Build an air filtering system to capture dust (since G8 doesn't have extraction or a window)</del> +
-    * Fit an external extractor fan (permission has been granted by Summerhall) +
-  * Build a dust extraction system to capture dust from the power tools +
-  * Purchase and install sensitive smoke alarm(s) to warn us before we cause a building evacuation +
-  * Build a standalone workbench (either 150x75cm or 180x75cm) +
-  * Fit shelf under right-section of new workbenches (40cm depth, wall-mounted)+
  
 ===== Other Stuff ===== ===== Other Stuff =====
  
   * Design a test pattern for checking/calibrating the laser cutter   * Design a test pattern for checking/calibrating the laser cutter
-  * Update OpenStreepMap to identify all the local takeaways +  * Build a webapp to view [[http://spaceapi.net|Space API]] data 
-  * Sort the PC parts and peripherals +
-  * <del>Make some door wedges</del>+
todo.txt · Last modified: 2022-07-04 19:30 by MirZa

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki