- | ====== | + | ====== To-Do (How can I help?) ====== |
- | ===== Mini Projects ===== | + | See also https:// |
- | ==== Fit shelving under G8 workbenches | + | ===== Small Tasks ===== |
- | We want to install shelving under the section of workbench | + | These should take up to 30 minutes for one person |
- | Status: Tim has fitted a frame and started cutting the boards to make the shelves. | + | * |
- | ==== Drill organisation | + | ===== Mini Projects |
- | + | ||
- | All of our drills (bits) currently sit in a single box. We should have a storage system for making it easier to find the right type and size, and to see what we have or what is missing. | + | |
- | + | ||
- | * Make or buy an organiser: | + | |
- | * Multiple holes for each size of drill (because one drill of each size is not enough for a hackerspace) | + | |
- | * Sections for HSS, brad-point and masonry | + | |
- | * Audit the drills. Dispose of bad ones. Sharpen where possible. Identify what we need to purchase for replacements/ | + | |
- | * Identify a suitable drill sharpening system to keep the drills in good condition. | + | |
- | + | ||
- | ==== Install ventilation in G8 Workshop ==== | + | |
- | + | ||
- | We have permission from Summerhall to install a fan in the external wall. There are two sections where previous vents have been bricked-up, and one of these should be opened and a fan installed. | + | |
- | * Plan how to remove the bricks safely and without damaging the rest of the wall. | + | ==== Repair Tektronix oscilloscope ==== |
- | * Source a suitable fan. | + | |
- | * Do the work... | + | |
- | * Clean/ | + | |
- | ==== Relocate extraction vent in G11 Store Room ==== | + | Scope has a power supply fault, and probably needs a capacitor replacement. |
- | The extract vent is currently located in the left corner as you enter the room. It should be relocate to the tile above the rear of the server rack, to better capture the hot air. We have an extra length of flexible hose that should enable this. | + | ==== Repair Rigol DS1102D oscilloscope ==== |
- | ==== Finish moving the workshop from G2 to G8 ==== | + | One channel has failed, believed |
- | * Mount the wall-mounted bins in G8 | + | This schematic might help: http:// |
- | * Move the tools and supplies from G2 to G8 | + | |
- | * Organise the shelves in G8, label them so tools can be returned to the same place each time. | + | |
- | * Move the chemicals from G1 to G8 (under the sink). Dispose of empty containers. | + | |
- | * Fit a smoke alarm in G8 (early warning system to avoid causing an evac of Summerhall). | + | |
===== Other Stuff ===== | ===== Other Stuff ===== | ||
* Design a test pattern for checking/ | * Design a test pattern for checking/ | ||
- | * Update OpenStreepMap | + | * Build a webapp |
- | * Sort the PC parts and peripherals | + | |