todo
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
todo [2016-09-27 09:45] – tim | todo [2020-01-30 12:40] – just_ben1996 | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | ====== | + | ====== To-Do (How can I help?) ====== |
- | ===== Mini Projects ===== | + | See also the [[members_nights|Members' |
- | ==== Fit shelving under G8 workbenches | + | ===== Small Tasks ===== |
- | We want to install shelving under the section of workbench to the right of the drill press. Just one shelf, | + | These should be immediately actionable, describable in a single bullet point and take up to 30 minutes for one person |
- | Status: Tim has fitted | + | * Tidy and clear-out the kitchen cupboard. Should only contain cleaning supplies. |
+ | * G1 hifi shelves: replace the short brackets with long brackets (we have a surplus | ||
+ | * Laser Cutter #1: Connect | ||
- | ==== Drill organisation ==== | ||
- | All of our drills (bits) currently sit in a single box. We should have a storage system for making it easier to find the right type and size, and to see what we have or what is missing. | + | ===== Bigger Tasks ===== |
- | * Make or buy an organiser: | + | These should be immediately actionable, describable in a single bullet |
- | * Multiple holes for each size of drill (because one drill of each size is not enough for a hackerspace) | + | |
- | * Sections for HSS, brad-point and masonry | + | |
- | * Audit the drills. Dispose of bad ones. Sharpen where possible. Identify what we need to purchase | + | |
- | * Identify a suitable drill sharpening system | + | |
- | ==== Install ventilation in G8 Workshop | + | * Pull additional Cat5 cables from between G11 and G14. |
+ | * Specify and purchase shelving for G14 (full-lengths, | ||
+ | * Tidy-up the radio corner. | ||
+ | ===== Infrastructure Projects ===== | ||
- | We have permission from Summerhall to install a fan in the external wall. There are two sections where previous vents have been bricked-up, and one of these should | + | More tasks may be found on the [[start# |
- | * Plan how to remove the bricks safely and without damaging the rest of the wall. | + | ===== Mini Projects ===== |
- | * Source a suitable fan. | + | |
- | * Do the work... | + | |
- | * Clean/ | + | |
- | ==== Relocate extraction vent in G11 Store Room ==== | + | Projects might require planning or additional purchases before they can be tackled. Some projects will need their own pages and a link from here. |
- | The extract vent is currently located in the left corner as you enter the room. It should be relocate to the tile above the rear of the server rack, to better capture the hot air. We have an extra length of flexible hose that should enable this. | + | ==== Repair Tektronix oscilloscope ==== |
- | ==== Finish moving the workshop from G2 to G8 ==== | + | Scope has a power supply fault, and probably needs a capacitor replacement. |
- | * Mount the wall-mounted bins in G8 | + | ==== Repair Rigol DS1102D oscilloscope ==== |
- | * Move the tools and supplies from G2 to G8 | + | |
- | * Organise the shelves in G8, label them so tools can be returned to the same place each time. | + | One channel has failed, believed to be in the front-end. Device is out of warranty and Rigol cannot offer replacement parts that would be economically worth-while. |
- | * Move the chemicals from G1 to G8 (under the sink). Dispose of empty containers. | + | |
- | * Fit a smoke alarm in G8 (early warning system to avoid causing an evac of Summerhall). | + | This schematic might help: http:// |
===== Other Stuff ===== | ===== Other Stuff ===== | ||
* Design a test pattern for checking/ | * Design a test pattern for checking/ | ||
- | * Update OpenStreepMap | + | * Build a webapp |
- | * Sort the PC parts and peripherals | + | |
+ | ===== Roundup ===== | ||
+ | |||
+ | The roundup tracker has been dropped due to lack of use. The archived list of open issues is as follows: | ||
+ | |||
+ | |||
+ | |||
+ | ^ id ^ activity ^ title ^ creator ^ assigned to ^ status ^ | ||
+ | | 94 | 2018-06-03.16: | ||
+ | | 99 | 2018-06-03.10: | ||
+ | | 93 | 2018-06-03.10: | ||
+ | | 95 | 2018-06-03.10: | ||
+ | | 98 | 2018-06-03.09: | ||
+ | | 96 | 2018-06-03.09: | ||
+ | | 54 | 2017-12-08.15: | ||
+ | | 52 | 2017-12-08.15: | ||
+ | | 56 | 2018-08-04.18: | ||
+ | | 17 | 2018-06-28.15: | ||
+ | | 73 | 2018-04-27.12: | ||
+ | | 79 | 2018-04-14.20: | ||
+ | | 11 | 2018-01-19.00: | ||
+ | | 18 | 2018-01-04.22: | ||
+ | | 33 | 2017-06-28.00: | ||
+ | | 32 | 2017-06-27.23: | ||
+ | | 97 | 2018-06-03.09: | ||
+ | | 28 | 2018-05-22.09: | ||
+ | | 9 | 2018-05-22.09: | ||
+ | | 67 | 2018-05-01.19: | ||
+ | | 89 | 2018-04-25.13: | ||
+ | | 20 | 2018-01-26.14: | ||
+ | | 104 | 2019-05-17.14: | ||
+ | | 63 | 2018-12-18.14: | ||
+ | | 69 | 2018-07-18.13: | ||
+ | | 47 | 2018-04-28.15: | ||
+ | | 92 | 2018-04-27.12: | ||
+ | | 90 | 2018-04-25.14: | ||
+ | | 61 | 2018-03-31.05: | ||
+ | | 26 | 2018-03-03.01: | ||
+ | | 60 | 2018-01-25.15: | ||
+ | | 58 | 2018-01-03.00: | ||
+ | | 30 | 2017-06-11.16: | ||
+ | | 70 | 2018-01-26.03: | ||
+ | | 87 | 2018-04-24.18: | ||
+ | | 83 | 2018-04-24.18: | ||
+ | | 86 | 2018-04-24.18: | ||
+ | | 59 | 2018-02-02.15: | ||
+ | (Mostly) Done tasks | ||
+ | ^ id ^ activity ^ title ^ creator ^ assigned to ^ status ^ | ||
+ | | 4 | 2017-04-24.14: | ||
+ | | 102 | 2019-03-23.11: | ||
+ | | 39 | 2019-03-09.18: | ||
+ | | 88 | 2018-04-24.18: | ||
+ | | 85 | 2018-04-24.17: | ||
+ | | 84 | 2018-04-24.17: | ||
+ | | 82 | 2018-04-24.17: | ||
+ | | 76 | 2019-06-09.10: | ||
+ | | 21 | 2018-06-03.18: | ||
+ | | 24 | 2018-04-13.09: | ||
+ | | 91 | 2018-04-27.12: |
todo.txt · Last modified: 2022-07-04 19:30 by MirZa