todo
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
todo [2016-10-07 14:00] – tim | todo [2019-07-09 12:15] – [Bigger Tasks] tim | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | ====== | + | ====== To-Do (How can I help?) ====== |
- | ===== Mini Projects ===== | + | See also [[https:// |
- | ==== Drill organisation | + | ===== Small Tasks ===== |
- | All of our drills (bits) currently sit in a single | + | These should be immediately actionable, describable |
- | * Make or buy an organiser: | + | * |
- | * Multiple holes for each size of drill (because one drill of each size is not enough for a hackerspace) | + | |
- | * Sections for HSS, brad-point and masonry | + | |
- | * Audit the drills. Dispose of bad ones. Sharpen where possible. Identify what we need to purchase for replacements/ | + | |
- | * Identify a suitable drill sharpening system to keep the drills in good condition. | + | |
- | ==== Install ventilation in G8 Workshop | + | ===== Bigger Tasks ===== |
- | We have permission from Summerhall to install a fan in the external wall. There are two sections where previous vents have been bricked-up, and one of these should be opened | + | These should be immediately actionable, describable in a single bullet point and take 1-3 hours for 1-2 people to complete: |
- | * Plan how to remove the bricks safely | + | * Pull 4 CAT5e cables from G11 rack to G14 and install |
- | * Source a suitable fan. | + | |
- | * Do the work... | + | |
- | * Clean/ | + | |
- | ==== Relocate extraction vent in G11 Store Room ==== | + | ===== Mini Projects ===== |
- | The extract vent is currently located in the left corner as you enter the room. It should | + | Projects might require planning or additional purchases before they can be tackled. Some projects will need their own pages and a link from here. |
- | ==== Finish moving the workshop from G2 to G8 ==== | + | ==== Repair Tektronix oscilloscope |
- | * Mount the wall-mounted bins in G8 | + | Scope has a power supply fault, |
- | * Move the tools and supplies from G2 to G8 | + | |
- | * Organise the shelves in G8, label them so tools can be returned to the same place each time. | + | ==== Repair Rigol DS1102D oscilloscope ==== |
- | * Move the chemicals from G1 to G8 (under the sink). Dispose of empty containers. | + | |
- | * Fit a smoke alarm in G8 (early warning system to avoid causing an evac of Summerhall). | + | One channel has failed, believed to be in the front-end. Device is out of warranty and Rigol cannot offer replacement parts that would be economically worth-while. |
+ | |||
+ | This schematic might help: http:// | ||
===== Other Stuff ===== | ===== Other Stuff ===== | ||
* Design a test pattern for checking/ | * Design a test pattern for checking/ | ||
- | * Update OpenStreepMap to identify all the local takeaways | ||
- | * Sort the PC parts and peripherals | ||
* Build a webapp to view [[http:// | * Build a webapp to view [[http:// | ||
- | |||
- | ===== Completed Projects ===== | ||
- | |||
- | ==== Fit shelving under G8 workbenches ==== | ||
- | |||
- | We want to install shelving under the section of workbench to the right of the drill press. Just one shelf, to divide the space into two. | ||
- | |||
todo.txt · Last modified: 2022-07-04 19:30 by MirZa