todo
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
todo [2016-10-07 14:00] – tim | todo [2019-08-07 21:27] – [Small Tasks] tim | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | ====== | + | ====== To-Do (How can I help?) ====== |
- | ===== Mini Projects ===== | + | See also [[https:// |
- | ==== Drill organisation | + | ===== Small Tasks ===== |
- | All of our drills (bits) currently sit in a single | + | These should be immediately actionable, describable |
- | * Make or buy an organiser: | + | * < |
- | * Multiple holes for each size of drill (because one drill of each size is not enough | + | * < |
- | * Sections for HSS, brad-point | + | * < |
- | * Audit the drills. Dispose of bad ones. Sharpen where possible. Identify what we need to purchase for replacements/ | + | * Tidy and clear-out the kitchen cupboard. Should only contain cleaning supplies. |
- | * Identify a suitable drill sharpening system to keep the drills | + | * G1 hifi shelves: replace |
+ | * Laser Cutter #1: Connect | ||
+ | * < | ||
+ | * Wire-up power supplies for tool lockers and PAT test | ||
+ | ===== Bigger Tasks ===== | ||
- | ==== Install ventilation | + | These should be immediately actionable, describable |
- | We have permission | + | * Pull < |
+ | * < | ||
- | * Plan how to remove the bricks safely and without damaging the rest of the wall. | + | ===== Infrastructure Projects ===== |
- | * Source a suitable fan. | + | |
- | * Do the work... | + | |
- | * Clean/ | + | |
- | ==== Relocate extraction vent in G11 Store Room ==== | + | More tasks may be found on the [[start# |
- | The extract vent is currently located in the left corner as you enter the room. It should be relocate to the tile above the rear of the server rack, to better capture the hot air. We have an extra length of flexible hose that should enable this. | + | ===== Mini Projects ===== |
- | ==== Finish moving the workshop | + | Projects might require planning or additional purchases before they can be tackled. Some projects will need their own pages and a link from here. |
- | * Mount the wall-mounted bins in G8 | + | ==== Repair Tektronix oscilloscope ==== |
- | * Move the tools and supplies from G2 to G8 | + | |
- | * Organise the shelves in G8, label them so tools can be returned to the same place each time. | + | |
- | * Move the chemicals from G1 to G8 (under the sink). Dispose of empty containers. | + | |
- | * Fit a smoke alarm in G8 (early warning system to avoid causing an evac of Summerhall). | + | |
- | ===== Other Stuff ===== | + | Scope has a power supply fault, and probably needs a capacitor replacement. |
- | * Design a test pattern for checking/ | + | ==== Repair Rigol DS1102D oscilloscope ==== |
- | * Update OpenStreepMap to identify all the local takeaways | + | |
- | * Sort the PC parts and peripherals | + | |
- | * Build a webapp to view [[http:// | + | |
- | ===== Completed Projects ===== | + | One channel has failed, believed to be in the front-end. Device is out of warranty and Rigol cannot offer replacement parts that would be economically worth-while. |
- | ==== Fit shelving under G8 workbenches ==== | + | This schematic might help: http:// |
- | We want to install shelving under the section of workbench to the right of the drill press. Just one shelf, to divide the space into two. | + | ===== Other Stuff ===== |
+ | * Design a test pattern for checking/ | ||
+ | * Build a webapp to view [[http:// | ||
todo.txt · Last modified: 2022-07-04 19:30 by MirZa