todo
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
todo [2016-10-07 14:00] – tim | todo [2022-02-04 22:10] – MirZa | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | ====== | + | ====== To-Do (How can I help?) ====== |
- | ===== Mini Projects ===== | + | See also the [[members_nights|Members' |
- | ==== Drill organisation | + | ===== Small Tasks ===== |
- | All of our drills (bits) currently sit in a single | + | These should be immediately actionable, describable |
- | * Make or buy an organiser: | + | * Tidy and clear-out the kitchen cupboard. Should only contain cleaning supplies. |
- | * Multiple holes for each size of drill (because one drill of each size is not enough for a hackerspace) | + | * G1 hifi shelves: replace the short brackets with long brackets (we have a surplus and the shelf would be more secure). |
- | * Sections for HSS, brad-point and masonry | + | |
- | * Audit the drills. Dispose of bad ones. Sharpen where possible. Identify what we need to purchase for replacements/ | + | |
- | * Identify | + | |
- | ==== Install ventilation in G8 Workshop ==== | ||
- | We have permission from Summerhall to install a fan in the external wall. There are two sections where previous vents have been bricked-up, and one of these should be opened and a fan installed. | + | ===== Bigger Tasks ===== |
- | * Plan how to remove the bricks safely and without damaging the rest of the wall. | + | These should be immediately actionable, describable in a single bullet point and take 1-3 hours for 1-2 people to complete: |
- | * Source | + | |
- | * Do the work... | + | |
- | * Clean/ | + | |
- | ==== Relocate extraction vent in G11 Store Room ==== | + | * Pull additional Cat5 cables from between |
+ | * Specify and purchase shelving for G14 (full-lengths, | ||
+ | * Tidy-up the radio corner. | ||
+ | * Fix Volume control / MQTT-IR bridge | ||
+ | * Fix Projector control | ||
- | The extract vent is currently located in the left corner as you enter the room. It should be relocate to the tile above the rear of the server rack, to better capture the hot air. We have an extra length of flexible hose that should enable this. | ||
- | ==== Finish moving the workshop from G2 to G8 ==== | + | ===== Infrastructure Projects ===== |
- | * Mount the wall-mounted bins in G8 | + | More tasks may be found on the [[start# |
- | * Move the tools and supplies | + | |
- | * Organise the shelves in G8, label them so tools can be returned to the same place each time. | + | ===== Mini Projects ===== |
- | * Move the chemicals from G1 to G8 (under | + | |
- | * Fit a smoke alarm in G8 (early warning system to avoid causing an evac of Summerhall). | + | Projects might require planning or additional purchases before they can be tackled. Some projects will need their own pages and a link from here. |
+ | |||
+ | ==== Repair Tektronix oscilloscope ==== | ||
+ | |||
+ | Scope has a power supply fault, and probably needs a capacitor replacement. | ||
+ | |||
+ | ==== Repair Rigol DS1102D oscilloscope ==== | ||
+ | |||
+ | One channel has failed, believed | ||
+ | |||
+ | This schematic might help: http:// | ||
+ | |||
+ | ==== Repair G1 Radio ==== | ||
+ | * replacing broken power supply with external one | ||
===== Other Stuff ===== | ===== Other Stuff ===== | ||
* Design a test pattern for checking/ | * Design a test pattern for checking/ | ||
- | * Update OpenStreepMap to identify all the local takeaways | ||
- | * Sort the PC parts and peripherals | ||
* Build a webapp to view [[http:// | * Build a webapp to view [[http:// | ||
- | ===== Completed Projects | + | ===== Roundup |
+ | |||
+ | The roundup tracker has been dropped due to lack of use. The archived list of open issues is as follows: | ||
- | ==== Fit shelving under G8 workbenches ==== | ||
- | We want to install shelving under the section of workbench to the right of the drill press. Just one shelf, to divide the space into two. | ||
+ | ^ id ^ activity ^ title ^ creator ^ assigned to ^ status ^ | ||
+ | | 94 | 2018-06-03.16: | ||
+ | | 99 | 2018-06-03.10: | ||
+ | | 93 | 2018-06-03.10: | ||
+ | | 95 | 2018-06-03.10: | ||
+ | | 98 | 2018-06-03.09: | ||
+ | | 96 | 2018-06-03.09: | ||
+ | | 54 | 2017-12-08.15: | ||
+ | | 52 | 2017-12-08.15: | ||
+ | | 56 | 2018-08-04.18: | ||
+ | | 17 | 2018-06-28.15: | ||
+ | | 73 | 2018-04-27.12: | ||
+ | | 11 | 2018-01-19.00: | ||
+ | | 18 | 2018-01-04.22: | ||
+ | | 33 | 2017-06-28.00: | ||
+ | | 32 | 2017-06-27.23: | ||
+ | | 97 | 2018-06-03.09: | ||
+ | | 28 | 2018-05-22.09: | ||
+ | | 9 | 2018-05-22.09: | ||
+ | | 67 | 2018-05-01.19: | ||
+ | | 89 | 2018-04-25.13: | ||
+ | | 20 | 2018-01-26.14: | ||
+ | | 104 | 2019-05-17.14: | ||
+ | | 63 | 2018-12-18.14: | ||
+ | | 69 | 2018-07-18.13: | ||
+ | | 47 | 2018-04-28.15: | ||
+ | | 92 | 2018-04-27.12: | ||
+ | | 90 | 2018-04-25.14: | ||
+ | | 61 | 2018-03-31.05: | ||
+ | | 26 | 2018-03-03.01: | ||
+ | | 60 | 2018-01-25.15: | ||
+ | | 58 | 2018-01-03.00: | ||
+ | | 70 | 2018-01-26.03: | ||
+ | | 87 | 2018-04-24.18: | ||
+ | | 83 | 2018-04-24.18: | ||
+ | | 86 | 2018-04-24.18: | ||
+ | | 59 | 2018-02-02.15: | ||
+ | (Mostly) Done tasks | ||
+ | ^ id ^ activity ^ title ^ creator ^ assigned to ^ status ^ | ||
+ | | 79 | 2018-04-14.20: | ||
+ | | 30 | 2017-06-11.16: | ||
+ | | 4 | 2017-04-24.14: | ||
+ | | 102 | 2019-03-23.11: | ||
+ | | 39 | 2019-03-09.18: | ||
+ | | 88 | 2018-04-24.18: | ||
+ | | 85 | 2018-04-24.17: | ||
+ | | 84 | 2018-04-24.17: | ||
+ | | 82 | 2018-04-24.17: | ||
+ | | 76 | 2019-06-09.10: | ||
+ | | 21 | 2018-06-03.18: | ||
+ | | 24 | 2018-04-13.09: | ||
+ | | 91 | 2018-04-27.12: |
todo.txt · Last modified: 2022-07-04 19:30 by MirZa