todo
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
todo [2016-10-07 14:01] – tim | todo [2019-07-09 12:13] – tim | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | ====== | + | ====== To-Do (How can I help?) ====== |
- | ===== Mini Projects ===== | + | See also [[https:// |
- | ==== Drill organisation | + | ===== Small Tasks ===== |
- | All of our drills (bits) currently sit in a single | + | These should be immediately actionable, describable |
- | * Make or buy an organiser: | + | * |
- | * Multiple holes for each size of drill (because one drill of each size is not enough for a hackerspace) | + | |
- | * Sections for HSS, brad-point and masonry | + | |
- | * Audit the drills. Dispose of bad ones. Sharpen where possible. Identify what we need to purchase for replacements/ | + | |
- | * Identify a suitable drill sharpening system to keep the drills in good condition. | + | |
- | ==== Finish moving the workshop from G2 to G8 ==== | + | ===== Bigger Tasks ===== |
- | * Mount the wall-mounted bins in G8 | + | These should be immediately actionable, describable |
- | * Move the tools and supplies from G2 to G8 | + | |
- | * Organise the shelves in G8, label them so tools can be returned to the same place each time. | + | |
- | * Move the chemicals from G1 to G8 (under the sink). Dispose of empty containers. | + | |
- | * Fit a smoke alarm in G8 (early warning system | + | |
- | ===== Other Stuff ===== | + | * Pull 4 CAT5e cables from G11 rack to G14 and install the access point. |
- | * Design a test pattern for checking/ | + | ===== Mini Projects ===== |
- | * Update OpenStreepMap to identify all the local takeaways | + | |
- | * Sort the PC parts and peripherals | + | |
- | * Build a webapp to view [[http:// | + | |
- | ---- | + | ==== Repair Tektronix oscilloscope ==== |
- | ===== Completed Projects ===== | + | Scope has a power supply fault, and probably needs a capacitor replacement. |
- | ==== Fit shelving under G8 workbenches | + | ==== Repair Rigol DS1102D oscilloscope |
- | We want to install shelving under the section | + | One channel has failed, believed |
- | ==== Relocate extraction vent in G11 Store Room ==== | + | This schematic might help: http:// |
- | The extract vent is currently located in the left corner as you enter the room. It should be relocate to the tile above the rear of the server rack, to better capture the hot air. We have an extra length of flexible hose that should enable this. | + | ===== Other Stuff ===== |
- | + | ||
- | ==== Install ventilation in G8 Workshop | + | |
- | + | ||
- | We have permission from Summerhall to install a fan in the external wall. There are two sections where previous vents have been bricked-up, and one of these should be opened and a fan installed. | + | |
- | + | ||
- | * Plan how to remove the bricks safely and without damaging the rest of the wall. | + | |
- | * Source a suitable fan. | + | |
- | * Do the work... | + | |
- | * Clean/ | + | |
+ | * Design a test pattern for checking/ | ||
+ | * Build a webapp to view [[http:// | ||
todo.txt · Last modified: 2022-07-04 19:30 by MirZa