todo
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
todo [2016-10-14 15:57] – [Finish moving the workshop from G2 to G8] tim | todo [2020-06-07 21:14] – [Small Tasks] MirZa | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | ====== | + | ====== To-Do (How can I help?) ====== |
- | ===== Mini Projects ===== | + | See also the [[members_nights|Members' |
- | ==== Drill organisation | + | ===== Small Tasks ===== |
- | All of our drills (bits) currently sit in a single | + | These should be immediately actionable, describable |
- | * Make or buy an organiser: | + | * Tidy and clear-out the kitchen cupboard. Should only contain cleaning supplies. |
- | * Multiple holes for each size of drill (because one drill of each size is not enough for a hackerspace) | + | * G1 hifi shelves: replace the short brackets with long brackets |
- | * Sections for HSS, brad-point | + | * < |
- | * Audit the drills. Dispose of bad ones. Sharpen where possible. Identify what we need to purchase for replacements/ | + | |
- | * Identify a suitable drill sharpening system to keep the drills | + | |
- | ==== Finish moving the workshop from G2 to G8 ==== | ||
- | * Clean the blue storage bins in G8 | + | ===== Bigger Tasks ===== |
- | * Move the tools and supplies from G2 to G8 | + | |
- | * Organise the shelves in G8, label them so tools can be returned to the same place each time. | + | |
- | * Move the chemicals from G1 to G8 (under the sink). Dispose of empty containers. | + | |
- | * Fit a smoke alarm in G8 (early warning system to avoid causing an evac of Summerhall). | + | |
- | ===== Other Stuff ===== | + | These should be immediately actionable, describable in a single bullet point and take 1-3 hours for 1-2 people to complete: |
- | * Design a test pattern for checking/ | + | * Pull additional Cat5 cables from between G11 and G14. |
- | * Update OpenStreepMap to identify all the local takeaways | + | * Specify and purchase shelving for G14 (full-lengths, |
- | * Sort the PC parts and peripherals | + | * Tidy-up |
- | * Build a webapp to view [[http:// | + | ===== Infrastructure Projects ===== |
- | ---- | + | More tasks may be found on the [[start# |
- | ===== Completed | + | ===== Mini Projects ===== |
- | ==== Fit shelving under G8 workbenches ==== | + | Projects might require planning or additional purchases before they can be tackled. Some projects will need their own pages and a link from here. |
- | We want to install shelving under the section of workbench to the right of the drill press. Just one shelf, to divide the space into two. | + | ==== Repair Tektronix oscilloscope ==== |
- | ==== Relocate extraction vent in G11 Store Room ==== | + | Scope has a power supply fault, and probably needs a capacitor replacement. |
+ | |||
+ | ==== Repair Rigol DS1102D oscilloscope ==== | ||
+ | |||
+ | One channel has failed, believed to be in the front-end. Device is out of warranty and Rigol cannot offer replacement parts that would be economically worth-while. | ||
+ | |||
+ | This schematic might help: http:// | ||
+ | |||
+ | ===== Other Stuff ===== | ||
+ | |||
+ | * Design a test pattern for checking/ | ||
+ | * Build a webapp to view [[http:// | ||
- | The extract vent is currently located in the left corner as you enter the room. It should be relocate to the tile above the rear of the server rack, to better capture the hot air. We have an extra length of flexible hose that should enable this. | + | ===== Roundup ===== |
- | ==== Install ventilation in G8 Workshop ==== | + | The roundup tracker has been dropped due to lack of use. The archived list of open issues is as follows: |
- | We have permission from Summerhall to install a fan in the external wall. There are two sections where previous vents have been bricked-up, and one of these should be opened and a fan installed. | ||
- | * Plan how to remove the bricks safely and without damaging the rest of the wall. | ||
- | * Source a suitable fan. | ||
- | * Do the work... | ||
- | * Clean/ | ||
+ | ^ id ^ activity ^ title ^ creator ^ assigned to ^ status ^ | ||
+ | | 94 | 2018-06-03.16: | ||
+ | | 99 | 2018-06-03.10: | ||
+ | | 93 | 2018-06-03.10: | ||
+ | | 95 | 2018-06-03.10: | ||
+ | | 98 | 2018-06-03.09: | ||
+ | | 96 | 2018-06-03.09: | ||
+ | | 54 | 2017-12-08.15: | ||
+ | | 52 | 2017-12-08.15: | ||
+ | | 56 | 2018-08-04.18: | ||
+ | | 17 | 2018-06-28.15: | ||
+ | | 73 | 2018-04-27.12: | ||
+ | | 11 | 2018-01-19.00: | ||
+ | | 18 | 2018-01-04.22: | ||
+ | | 33 | 2017-06-28.00: | ||
+ | | 32 | 2017-06-27.23: | ||
+ | | 97 | 2018-06-03.09: | ||
+ | | 28 | 2018-05-22.09: | ||
+ | | 9 | 2018-05-22.09: | ||
+ | | 67 | 2018-05-01.19: | ||
+ | | 89 | 2018-04-25.13: | ||
+ | | 20 | 2018-01-26.14: | ||
+ | | 104 | 2019-05-17.14: | ||
+ | | 63 | 2018-12-18.14: | ||
+ | | 69 | 2018-07-18.13: | ||
+ | | 47 | 2018-04-28.15: | ||
+ | | 92 | 2018-04-27.12: | ||
+ | | 90 | 2018-04-25.14: | ||
+ | | 61 | 2018-03-31.05: | ||
+ | | 26 | 2018-03-03.01: | ||
+ | | 60 | 2018-01-25.15: | ||
+ | | 58 | 2018-01-03.00: | ||
+ | | 70 | 2018-01-26.03: | ||
+ | | 87 | 2018-04-24.18: | ||
+ | | 83 | 2018-04-24.18: | ||
+ | | 86 | 2018-04-24.18: | ||
+ | | 59 | 2018-02-02.15: | ||
+ | (Mostly) Done tasks | ||
+ | ^ id ^ activity ^ title ^ creator ^ assigned to ^ status ^ | ||
+ | | 79 | 2018-04-14.20: | ||
+ | | 30 | 2017-06-11.16: | ||
+ | | 4 | 2017-04-24.14: | ||
+ | | 102 | 2019-03-23.11: | ||
+ | | 39 | 2019-03-09.18: | ||
+ | | 88 | 2018-04-24.18: | ||
+ | | 85 | 2018-04-24.17: | ||
+ | | 84 | 2018-04-24.17: | ||
+ | | 82 | 2018-04-24.17: | ||
+ | | 76 | 2019-06-09.10: | ||
+ | | 21 | 2018-06-03.18: | ||
+ | | 24 | 2018-04-13.09: | ||
+ | | 91 | 2018-04-27.12: |
todo.txt · Last modified: 2022-07-04 19:30 by MirZa