todo
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
todo [2016-10-18 14:25] – tim | todo [2019-08-29 14:52] – [Bigger Tasks] tim | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | ====== | + | ====== To-Do (How can I help?) ====== |
- | ===== Mini Projects ===== | + | See also [[https:// |
- | ==== Drill organisation | + | ===== Small Tasks ===== |
- | All of our drills (bits) currently sit in a single | + | These should be immediately actionable, describable |
- | * Make or buy an organiser: | + | * Tidy and clear-out the kitchen cupboard. Should only contain cleaning supplies. |
- | * Multiple holes for each size of drill (because one drill of each size is not enough for a hackerspace) | + | * G1 hifi shelves: replace the short brackets with long brackets |
- | * Sections for HSS, brad-point and masonry | + | * Laser Cutter #1: Connect the air-flow sensor into the safety loop (in series with the lid switch, water flow sensor, etc). |
- | * Audit the drills. Dispose of bad ones. Sharpen | + | * Wire-up LEDs for one remaining tool locker. |
- | * Identify | + | * Secure tool locker LED wiring with hot glue (at the point where the wires meet the LED strip). |
+ | * Install | ||
- | ==== Finish moving the workshop from G2 to G8 ==== | + | ===== Bigger Tasks ===== |
- | * Clean the blue storage bins in G8 | + | These should be immediately actionable, describable |
- | * Move the tools and supplies from G2 to G8 | + | |
- | * Organise the shelves in G8, label them so tools can be returned to the same place each time. | + | * Pull additional Cat5 cables from between G11 and G14. |
- | * Move the chemicals from G1 to G8 (under | + | * Specify and purchase shelving for G14 (full-lengths, 300mm depth). |
- | * Fit a smoke alarm in G8 (early warning system to avoid causing an evac of Summerhall). | + | * Install spur for G1 water heater. |
+ | |||
+ | ===== Infrastructure Projects ===== | ||
+ | |||
+ | More tasks may be found on the [[start# | ||
+ | |||
+ | ===== Mini Projects ===== | ||
+ | |||
+ | Projects might require planning or additional purchases before they can be tackled. Some projects will need their own pages and a link from here. | ||
==== Repair Tektronix oscilloscope ==== | ==== Repair Tektronix oscilloscope ==== | ||
Line 25: | Line 34: | ||
Scope has a power supply fault, and probably needs a capacitor replacement. | Scope has a power supply fault, and probably needs a capacitor replacement. | ||
- | ==== Repair Rigol oscilloscope ==== | + | ==== Repair Rigol DS1102D |
One channel has failed, believed to be in the front-end. Device is out of warranty and Rigol cannot offer replacement parts that would be economically worth-while. | One channel has failed, believed to be in the front-end. Device is out of warranty and Rigol cannot offer replacement parts that would be economically worth-while. | ||
Line 34: | Line 43: | ||
* Design a test pattern for checking/ | * Design a test pattern for checking/ | ||
- | * Update OpenStreepMap to identify all the local takeaways | ||
- | * Sort the PC parts and peripherals | ||
* Build a webapp to view [[http:// | * Build a webapp to view [[http:// | ||
- | |||
- | ---- | ||
- | |||
- | ===== Completed Projects ===== | ||
- | |||
- | ==== Fit shelving under G8 workbenches ==== | ||
- | |||
- | We want to install shelving under the section of workbench to the right of the drill press. Just one shelf, to divide the space into two. | ||
- | |||
- | ==== Relocate extraction vent in G11 Store Room ==== | ||
- | |||
- | The extract vent is currently located in the left corner as you enter the room. It should be relocate to the tile above the rear of the server rack, to better capture the hot air. We have an extra length of flexible hose that should enable this. | ||
- | |||
- | ==== Install ventilation in G8 Workshop ==== | ||
- | |||
- | We have permission from Summerhall to install a fan in the external wall. There are two sections where previous vents have been bricked-up, and one of these should be opened and a fan installed. | ||
- | |||
- | * Plan how to remove the bricks safely and without damaging the rest of the wall. | ||
- | * Source a suitable fan. | ||
- | * Do the work... | ||
- | * Clean/ | ||
- | |||
todo.txt · Last modified: 2022-07-04 19:30 by MirZa