todo
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
todo [2019-07-09 12:15] – [Bigger Tasks] tim | todo [2019-08-29 14:53] – [Bigger Tasks] tim | ||
---|---|---|---|
Line 7: | Line 7: | ||
These should be immediately actionable, describable in a single bullet point and take up to 30 minutes for one person to complete: | These should be immediately actionable, describable in a single bullet point and take up to 30 minutes for one person to complete: | ||
- | * | + | * Tidy and clear-out the kitchen cupboard. Should only contain cleaning supplies. |
+ | * G1 hifi shelves: replace the short brackets with long brackets (we have a surplus and the shelf would be more secure). | ||
+ | * Laser Cutter #1: Connect the air-flow sensor into the safety loop (in series with the lid switch, water flow sensor, etc). | ||
+ | * Wire-up LEDs for one remaining tool locker. | ||
+ | * Secure tool locker LED wiring with hot glue (at the point where the wires meet the LED strip). | ||
+ | * Install a locker controller and LED in the battery-charging compartment. | ||
===== Bigger Tasks ===== | ===== Bigger Tasks ===== | ||
Line 13: | Line 18: | ||
These should be immediately actionable, describable in a single bullet point and take 1-3 hours for 1-2 people to complete: | These should be immediately actionable, describable in a single bullet point and take 1-3 hours for 1-2 people to complete: | ||
- | * Pull 4 CAT5e cables from G11 rack to G14 and install | + | * Pull additional Cat5 cables from between |
+ | * Specify | ||
+ | * Install spur for G1 water heater. | ||
+ | * Tidy-up the radio corner. | ||
+ | ===== Infrastructure Projects ===== | ||
+ | |||
+ | More tasks may be found on the [[start# | ||
===== Mini Projects ===== | ===== Mini Projects ===== |
todo.txt · Last modified: 2022-07-04 19:30 by MirZa