todo
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
todo [2019-08-29 14:52] – [Bigger Tasks] tim | todo [2019-08-29 15:08] – [Small Tasks] tim | ||
---|---|---|---|
Line 13: | Line 13: | ||
* Secure tool locker LED wiring with hot glue (at the point where the wires meet the LED strip). | * Secure tool locker LED wiring with hot glue (at the point where the wires meet the LED strip). | ||
* Install a locker controller and LED in the battery-charging compartment. | * Install a locker controller and LED in the battery-charging compartment. | ||
+ | * Move G6 (Al's room) access point to G11. | ||
+ | |||
===== Bigger Tasks ===== | ===== Bigger Tasks ===== | ||
Line 21: | Line 23: | ||
* Specify and purchase shelving for G14 (full-lengths, | * Specify and purchase shelving for G14 (full-lengths, | ||
* Install spur for G1 water heater. | * Install spur for G1 water heater. | ||
+ | * Tidy-up the radio corner. | ||
===== Infrastructure Projects ===== | ===== Infrastructure Projects ===== | ||
todo.txt · Last modified: 2022-07-04 19:30 by MirZa