todo
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
todo [2016-06-23 22:25] – tim | todo [2022-05-21 11:39] – river | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | ====== | + | ====== To-Do (How can I help?) ====== |
- | ===== New Room ===== | + | See also the [[members_nights|Members' |
- | Recycling: | + | ===== Small Tasks ===== |
- | * < | + | These should be immediately actionable, describable |
- | * Take the waste electronics (in old storeroom G8) to the recycling centre | + | |
- | * Take your [[clutter|junk]] away [**EVERYONE**] | + | |
- | G11: | + | * Tidy and clear-out the kitchen cupboard. Should only contain cleaning supplies. |
+ | * G1 hifi shelves: replace the short brackets with long brackets (we have a surplus and the shelf would be more secure). | ||
- | * < | ||
- | * < | ||
- | * Wipe down cable conduits | ||
- | * Arrange disposal/ | ||
- | * < | ||
- | * < | ||
- | * < | ||
- | * < | ||
- | * < | ||
- | * < | ||
- | * < | ||
- | * < | ||
- | * < | ||
- | * < | ||
- | * Acquire server rack | ||
- | * < | ||
- | * Fit twin-slot shelving over sink area - postpone, see what's left after we do the new workshop | ||
- | * < | ||
- | * < | ||
- | * Source a pull-handle and build a capacitive touch sensor | ||
- | * Fit PIR sensor < | ||
- | * Final clear-out from G8 to G11 | ||
- | G8: | + | ===== Bigger Tasks ===== |
- | * Measure room and create | + | These should be immediately actionable, describable in a single bullet point and take 1-3 hours for 1-2 people |
- | * Agree new layout [**EVERYONE**] | + | |
- | * Build and install fitted workbench | + | |
- | * Install wall-mounted tool boards | + | |
- | * Install wall-mounted shelves | + | |
- | * Build an air filtering system | + | |
- | * Build a dust extraction system to capture dust from the power tools | + | |
- | * Purchase and install sensitive smoke alarm(s) to warn us before we cause a building evacuation | + | |
- | Financial: | + | * Pull additional Cat5 cables from between G11 and G14. |
+ | * Specify and purchase shelving for G14 (full-lengths, | ||
+ | * Tidy-up the radio corner. | ||
+ | * Fix Volume control / MQTT-IR bridge | ||
+ | * Fix Projector control | ||
- | * Recruit more members to help us pay for the room [**EVERYONE**] | + | |
- | * Notify council | + | ===== Infrastructure Projects ===== |
+ | |||
+ | More tasks may be found on the [[start# | ||
+ | |||
+ | ===== Mini Projects ===== | ||
+ | |||
+ | Projects might require planning or additional purchases before they can be tackled. Some projects will need their own pages and a link from here. | ||
+ | |||
+ | ==== Repair Tektronix oscilloscope ==== | ||
+ | |||
+ | Scope has a power supply fault, and probably needs a capacitor replacement. | ||
+ | |||
+ | ==== Repair Rigol DS1102D oscilloscope ==== | ||
+ | |||
+ | One channel has failed, believed to be in the front-end. Device is out of warranty | ||
+ | |||
+ | This schematic might help: http:// | ||
===== Other Stuff ===== | ===== Other Stuff ===== | ||
* Design a test pattern for checking/ | * Design a test pattern for checking/ | ||
- | * Update | + | * Build a webapp to view [[http:// |
- | * Make some door wedges | + | |
+ | ===== Roundup ===== | ||
+ | |||
+ | The roundup tracker has been dropped due to lack of use. The archived list of open issues is as follows: | ||
+ | |||
+ | |||
+ | ^ id ^ activity ^ title ^ creator ^ assigned to ^ status ^ | ||
+ | | 94 | 2018-06-03.16: | ||
+ | | 99 | 2018-06-03.10: | ||
+ | | 93 | 2018-06-03.10: | ||
+ | | 95 | 2018-06-03.10: | ||
+ | | 98 | 2018-06-03.09: | ||
+ | | 96 | 2018-06-03.09: | ||
+ | | 54 | 2017-12-08.15: | ||
+ | | 52 | 2017-12-08.15: | ||
+ | | 56 | 2018-08-04.18: | ||
+ | | 17 | 2018-06-28.15: | ||
+ | | 73 | 2018-04-27.12: | ||
+ | | 11 | 2018-01-19.00: | ||
+ | | 33 | 2017-06-28.00: | ||
+ | | 32 | 2017-06-27.23: | ||
+ | | 97 | 2018-06-03.09: | ||
+ | | 28 | 2018-05-22.09: | ||
+ | | 9 | 2018-05-22.09: | ||
+ | | 67 | 2018-05-01.19: | ||
+ | | 89 | 2018-04-25.13: | ||
+ | | 104 | 2019-05-17.14: | ||
+ | | 63 | 2018-12-18.14: | ||
+ | | 69 | 2018-07-18.13: | ||
+ | | 92 | 2018-04-27.12: | ||
+ | | 90 | 2018-04-25.14: | ||
+ | | 61 | 2018-03-31.05: | ||
+ | | 26 | 2018-03-03.01: | ||
+ | | 60 | 2018-01-25.15: | ||
+ | | 58 | 2018-01-03.00: | ||
+ | | 70 | 2018-01-26.03: | ||
+ | | 87 | 2018-04-24.18: | ||
+ | | 83 | 2018-04-24.18: | ||
+ | | 86 | 2018-04-24.18: | ||
+ | | 59 | 2018-02-02.15: | ||
+ | |||
+ | (Mostly) Done tasks | ||
+ | ^ id ^ activity ^ title ^ creator ^ assigned | ||
+ | | 79 | 2018-04-14.20: | ||
+ | | 30 | 2017-06-11.16: | ||
+ | | 4 | 2017-04-24.14: | ||
+ | | 102 | 2019-03-23.11: | ||
+ | | 39 | 2019-03-09.18: | ||
+ | | 88 | 2018-04-24.18: | ||
+ | | 85 | 2018-04-24.17: | ||
+ | | 84 | 2018-04-24.17: | ||
+ | | 82 | 2018-04-24.17: | ||
+ | | 24 | 2018-04-13.09: |
todo.txt · Last modified: 2022-07-04 19:30 by MirZa