todo [2016-10-07 14:00] – tim | todo [2016-10-14 15:57] – [Finish moving the workshop from G2 to G8] tim | ||
---|---|---|---|
Line 12: | Line 12: | ||
* Audit the drills. Dispose of bad ones. Sharpen where possible. Identify what we need to purchase for replacements/ | * Audit the drills. Dispose of bad ones. Sharpen where possible. Identify what we need to purchase for replacements/ | ||
* Identify a suitable drill sharpening system to keep the drills in good condition. | * Identify a suitable drill sharpening system to keep the drills in good condition. | ||
- | |||
- | ==== Install ventilation in G8 Workshop ==== | ||
- | |||
- | We have permission from Summerhall to install a fan in the external wall. There are two sections where previous vents have been bricked-up, and one of these should be opened and a fan installed. | ||
- | |||
- | * Plan how to remove the bricks safely and without damaging the rest of the wall. | ||
- | * Source a suitable fan. | ||
- | * Do the work... | ||
- | * Clean/ | ||
- | |||
- | ==== Relocate extraction vent in G11 Store Room ==== | ||
- | |||
- | The extract vent is currently located in the left corner as you enter the room. It should be relocate to the tile above the rear of the server rack, to better capture the hot air. We have an extra length of flexible hose that should enable this. | ||
==== Finish moving the workshop from G2 to G8 ==== | ==== Finish moving the workshop from G2 to G8 ==== | ||
- | * Mount the wall-mounted | + | * Clean the blue storage |
* Move the tools and supplies from G2 to G8 | * Move the tools and supplies from G2 to G8 | ||
* Organise the shelves in G8, label them so tools can be returned to the same place each time. | * Organise the shelves in G8, label them so tools can be returned to the same place each time. | ||
Line 40: | Line 27: | ||
* Sort the PC parts and peripherals | * Sort the PC parts and peripherals | ||
* Build a webapp to view [[http:// | * Build a webapp to view [[http:// | ||
+ | |||
+ | ---- | ||
===== Completed Projects ===== | ===== Completed Projects ===== | ||
Line 46: | Line 35: | ||
We want to install shelving under the section of workbench to the right of the drill press. Just one shelf, to divide the space into two. | We want to install shelving under the section of workbench to the right of the drill press. Just one shelf, to divide the space into two. | ||
+ | |||
+ | ==== Relocate extraction vent in G11 Store Room ==== | ||
+ | |||
+ | The extract vent is currently located in the left corner as you enter the room. It should be relocate to the tile above the rear of the server rack, to better capture the hot air. We have an extra length of flexible hose that should enable this. | ||
+ | |||
+ | ==== Install ventilation in G8 Workshop ==== | ||
+ | |||
+ | We have permission from Summerhall to install a fan in the external wall. There are two sections where previous vents have been bricked-up, and one of these should be opened and a fan installed. | ||
+ | |||
+ | * Plan how to remove the bricks safely and without damaging the rest of the wall. | ||
+ | * Source a suitable fan. | ||
+ | * Do the work... | ||
+ | * Clean/ | ||