todo
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
todo [2016-10-14 15:57] – [Finish moving the workshop from G2 to G8] tim | todo [2019-10-30 00:42] – formatted roundup archive as table MirZa | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | ====== | + | ====== To-Do (How can I help?) ====== |
- | ===== Mini Projects ===== | + | See also the [[members_nights|Members' |
- | ==== Drill organisation | + | ===== Small Tasks ===== |
- | All of our drills (bits) currently sit in a single | + | These should be immediately actionable, describable |
- | * Make or buy an organiser: | + | * Tidy and clear-out the kitchen cupboard. Should only contain cleaning supplies. |
- | * Multiple holes for each size of drill (because one drill of each size is not enough for a hackerspace) | + | * G1 hifi shelves: replace the short brackets with long brackets |
- | * Sections for HSS, brad-point and masonry | + | * Laser Cutter #1: Connect |
- | * Audit the drills. Dispose of bad ones. Sharpen where possible. Identify what we need to purchase for replacements/ | + | * Move G6 (Al's room) access point to G11. |
- | * Identify a suitable drill sharpening system | + | |
- | ==== Finish moving the workshop from G2 to G8 ==== | ||
- | * Clean the blue storage bins in G8 | + | ===== Bigger Tasks ===== |
- | * Move the tools and supplies from G2 to G8 | + | |
- | * Organise the shelves in G8, label them so tools can be returned to the same place each time. | + | |
- | * Move the chemicals from G1 to G8 (under the sink). Dispose of empty containers. | + | |
- | * Fit a smoke alarm in G8 (early warning system to avoid causing an evac of Summerhall). | + | |
- | ===== Other Stuff ===== | + | These should be immediately actionable, describable in a single bullet point and take 1-3 hours for 1-2 people to complete: |
- | * Design a test pattern for checking/ | + | * Pull additional Cat5 cables from between G11 and G14. |
- | * Update OpenStreepMap to identify all the local takeaways | + | * Specify and purchase shelving for G14 (full-lengths, |
- | * Sort the PC parts and peripherals | + | * Install spur for G1 water heater. |
- | * Build a webapp to view [[http:// | + | * Tidy-up the radio corner. |
+ | ===== Infrastructure Projects ===== | ||
- | ---- | + | More tasks may be found on the [[start# |
- | ===== Completed | + | ===== Mini Projects ===== |
- | ==== Fit shelving under G8 workbenches ==== | + | Projects might require planning or additional purchases before they can be tackled. Some projects will need their own pages and a link from here. |
- | We want to install shelving under the section of workbench to the right of the drill press. Just one shelf, to divide the space into two. | + | ==== Repair Tektronix oscilloscope ==== |
- | ==== Relocate extraction vent in G11 Store Room ==== | + | Scope has a power supply fault, and probably needs a capacitor replacement. |
- | The extract vent is currently located | + | ==== Repair Rigol DS1102D oscilloscope ==== |
+ | |||
+ | One channel has failed, believed to be in the front-end. Device is out of warranty and Rigol cannot offer replacement parts that would be economically worth-while. | ||
+ | |||
+ | This schematic might help: http:// | ||
+ | |||
+ | ===== Other Stuff ===== | ||
+ | |||
+ | * Design a test pattern for checking/ | ||
+ | * Build a webapp | ||
- | ==== Install ventilation in G8 Workshop | + | ===== Roundup ===== |
- | We have permission from Summerhall to install a fan in the external wall. There are two sections where previous vents have been bricked-up, and one of these should be opened and a fan installed. | + | The roundup tracker has been dropped due to lack of use. The archived list of open issues is as follows: |
- | * Plan how to remove the bricks safely and without damaging the rest of the wall. | ||
- | * Source a suitable fan. | ||
- | * Do the work... | ||
- | * Clean/ | ||
+ | ^ id ^ activity ^ title ^ creator ^ assigned to ^ status ^ | ||
+ | | 94 | 2018-06-03.16: | ||
+ | | 99 | 2018-06-03.10: | ||
+ | | 93 | 2018-06-03.10: | ||
+ | | 95 | 2018-06-03.10: | ||
+ | | 98 | 2018-06-03.09: | ||
+ | | 96 | 2018-06-03.09: | ||
+ | | 54 | 2017-12-08.15: | ||
+ | | 52 | 2017-12-08.15: | ||
+ | | 39 | 2019-03-09.18: | ||
+ | | 56 | 2018-08-04.18: | ||
+ | | 17 | 2018-06-28.15: | ||
+ | | 73 | 2018-04-27.12: | ||
+ | | 88 | 2018-04-24.18: | ||
+ | | 87 | 2018-04-24.18: | ||
+ | | 85 | 2018-04-24.17: | ||
+ | | 84 | 2018-04-24.17: | ||
+ | | 82 | 2018-04-24.17: | ||
+ | | 79 | 2018-04-14.20: | ||
+ | | 70 | 2018-01-26.03: | ||
+ | | 11 | 2018-01-19.00: | ||
+ | | 18 | 2018-01-04.22: | ||
+ | | 33 | 2017-06-28.00: | ||
+ | | 32 | 2017-06-27.23: | ||
+ | | 4 | 2017-04-24.14: | ||
+ | | 76 | 2019-06-09.10: | ||
+ | | 21 | 2018-06-03.18: | ||
+ | | 97 | 2018-06-03.09: | ||
+ | | 28 | 2018-05-22.09: | ||
+ | | 9 | 2018-05-22.09: | ||
+ | | 67 | 2018-05-01.19: | ||
+ | | 89 | 2018-04-25.13: | ||
+ | | 24 | 2018-04-13.09: | ||
+ | | 20 | 2018-01-26.14: | ||
+ | | 104 | 2019-05-17.14: | ||
+ | | 102 | 2019-03-23.11: | ||
+ | | 63 | 2018-12-18.14: | ||
+ | | 69 | 2018-07-18.13: | ||
+ | | 47 | 2018-04-28.15: | ||
+ | | 92 | 2018-04-27.12: | ||
+ | | 91 | 2018-04-27.12: | ||
+ | | 90 | 2018-04-25.14: | ||
+ | | 83 | 2018-04-24.18: | ||
+ | | 86 | 2018-04-24.18: | ||
+ | | 61 | 2018-03-31.05: | ||
+ | | 26 | 2018-03-03.01: | ||
+ | | 59 | 2018-02-02.15: | ||
+ | | 60 | 2018-01-25.15: | ||
+ | | 58 | 2018-01-03.00: | ||
+ | | 30 | 2017-06-11.16: |
todo.txt · Last modified: 2022-07-04 19:30 by MirZa